Skip to content
Wattsmith Electric

Corpus Christi new homes, for builders

New construction electrician Corpus Christi for production and custom builders

Corpus Christi home builders hire us to wire new houses, from construction power until AEP Texas energizes the permanent meter. Service calls, repairs and remodels on existing homes stay in the San Antonio area only.

  • Licensed and Insured
  • BBB Accredited
  • Veteran Owned
  • TECL 41806

Tell us what is going on

Tap what you need, tell us when, and a real electrician calls you back.

Step 1 of 2

What do you need?
When works for you?

Sparks, burning smell, or a dead panel? Call (210) 446-5446 now instead of waiting on a callback.

We only use your number to call you back about this job.

By continuing, you agree that Wattsmith may call or text you back about your request.

You approve one flat price before any work starts. No hourly meter, no surprise invoice.

We hit your window. Miss it with no heads-up, and that is $149 off. The fine print

A Wattsmith electrician calls you back within 15 minutes during business hours.

Corpus Christi new homes

What are the steps to power a new house built in Corpus Christi?

Construction power starts with AEP Texas's Temporary Service form and an ESI ID. The electrical permit is filed after the city issues the building permit, by a contractor with current city registration. AEP Texas then designs permanent service from the site plan and load information, and energizes the meter once it has the inspection and deposits.

Construction power

Construction power starts with AEP Texas's Temporary Service form, which requests an ESI ID for electricity during construction. AEP's guide says it has specific requirements for each temporary service, with pole details in its figures, and its tariff has temporary facilities paid for before AEP builds them. The city's amendments call these temporary construction loops.

  • AEP Temporary Service form
  • ESI ID for construction power
  • Pole built to AEP's figures

The city's permit steps

A new home submission to the city includes the site and floor plans and a TDI windstorm WPI-1. The electrical permit is a subcontractor application filed after the building permit is issued, and the contractor's city registration must be current. The checklist names the 2020 NEC; we build to the edition under review. The C of O is the final step.

Permanent service from AEP Texas

Builders request permanent service from AEP Texas online or by phone at 877-373-4858 and get a 9-digit number, with a technician site visit if needed. The visit wants the site-ready date, site plan, meter location and load information, and the design package covers easements, a drawing and any cost. The meter is energized once AEP has the inspection and deposits.

  • Site-ready date and site plan
  • Planned meter location
  • Load information for the design

Wiring each house

Rough wiring follows framing and devices go in after paint. AEP's guide calls for at least 200 amp services on dwellings in AEP West, which includes AEP Texas, allows no 100 amp meter sockets there, lists a 36 inch burial depth for Texas, and requires a surge protective device on every service supplying dwelling units.

  • Rough-in after framing
  • Trim-out after paint
  • Meter base, service entrance and surge device

Questions about new-construction residential wiring for corpus christi home builders? Call or get a quote.

Free Corpus Christi estimate

Can a Corpus Christi builder send plans for a per-plan price?

Send the builder, the subdivision or lots, the number of plans and the start date. We answer the same business day.

Prefer to talk? Call (210) 446-5446.

Step 1 of 2

What do you need?
When works for you?

Sparks, burning smell, or a dead panel? Call (210) 446-5446 now instead of waiting on a callback.

We only use your number to call you back about this job.

By continuing, you agree that Wattsmith may call or text you back about your request.

You approve one flat price before any work starts. No hourly meter, no surprise invoice.

We hit your window. Miss it with no heads-up, and that is $149 off. The fine print

A Wattsmith electrician calls you back within 15 minutes during business hours.

FAQ

Which questions do Corpus Christi builders raise first?

Straight answers. If you do not see yours, call us and ask.

Do you wire for production builders, custom builders, or both?

Both. Send the plan set and we price it plan by plan.

Will you take other residential jobs around Corpus Christi?

No. Around Corpus Christi our residential work is new construction for builders. Service calls, repairs and remodels on existing homes stay in the San Antonio area only.

Call NowGet a Quote