Skip to content
Wattsmith Electric

Corpus Christi commercial lighting

Commercial LED lighting retrofit Corpus Christi for stores, offices and warehouses

Lighting shows up twice on a Corpus Christi commercial bill: in the energy used and in the kW demand AEP Texas bills its delivery on. We replace fixtures with LED, measure the load that comes off at the busy hours, and give the price in a free written estimate.

  • Licensed and Insured
  • BBB Accredited
  • Veteran Owned
  • TECL 41806

Tell us what is going on

Tap what you need, tell us when, and a real electrician calls you back.

Step 1 of 2

What do you need?
When works for you?

Sparks, burning smell, or a dead panel? Call (210) 446-5446 now instead of waiting on a callback.

We only use your number to call you back about this job.

By continuing, you agree that Wattsmith may call or text you back about your request.

You approve one flat price before any work starts. No hourly meter, no surprise invoice.

We hit your window. Miss it with no heads-up, and that is $149 off. The fine print

A Wattsmith electrician calls you back within 15 minutes during business hours.

Corpus Christi lighting work

Why does an LED retrofit change a Corpus Christi commercial electric bill?

AEP Texas bills delivery for service above 10 kW on the kW used in the busiest 15 minutes of the month, and lights burning then are part of that number. Some riders carry an 80% ratchet, and primary service carries it on distribution, so lower lighting load trims energy use and future demand charges together.

The busiest 15 minutes of the month

Business service at secondary voltage with demand above 10 kW falls under AEP Texas's Secondary Voltage Service Greater Than 10 kW schedule. Its billing demand is the kW supplied in the 15-minute period of maximum use each month, and every fixture burning in that period is counted in it.

Where AEP's 80% ratchet applies

On the secondary schedule the 80% ratchet sets the demand for certain riders, the higher of this month or 80% of the top month in the prior 11, and not the distribution charge. On primary line service the ratchet does apply to distribution. Sites that have reached 700 kW pay transmission on ERCOT's four summer peaks, too.

Reading the bill before and after

In the competitive market AEP Texas bills its delivery charges to the retail electric provider a business picked, and that provider puts them on the business's bill. Customers of Nueces Electric Cooperative sit outside that market. We ask for recent bills so the demand line can be compared once the retrofit is done.

  • Recent bills with the demand line
  • Fixture counts and burn hours
  • Which areas stay lit at the peak

What we usually change

High bays over racking, office troffers and can lights, canopy lights over fuel islands and drive-throughs, wall packs and parking lot heads cover most Corpus Christi retrofits. Where it helps we add occupancy sensors or rework switching, and we fix the wiring faults that old fixtures were hiding.

  • Warehouse high bays
  • Office troffers and downlights
  • Canopies, wall packs and lot heads
  • Sensors and switching

Questions about commercial led lighting retrofits in corpus christi? Call or get a quote.

Free Corpus Christi estimate

How do I get an LED retrofit estimate for a Corpus Christi building?

Send the kind of building, a rough fixture count and the hours it is open; a recent bill helps. We answer the same business day.

Prefer to talk? Call (210) 446-5446.

Step 1 of 2

What do you need?
When works for you?

Sparks, burning smell, or a dead panel? Call (210) 446-5446 now instead of waiting on a callback.

We only use your number to call you back about this job.

By continuing, you agree that Wattsmith may call or text you back about your request.

You approve one flat price before any work starts. No hourly meter, no surprise invoice.

We hit your window. Miss it with no heads-up, and that is $149 off. The fine print

A Wattsmith electrician calls you back within 15 minutes during business hours.

FAQ

What do Corpus Christi building owners ask about LED retrofits?

Straight answers. If you do not see yours, call us and ask.

Does an LED retrofit cut the AEP Texas demand charge?

It takes lighting load out of your 15-minute peak. How much shows on the bill depends on your schedule and whether a ratchet carries an earlier peak forward.

Can fixtures be changed outside business hours?

Yes. We schedule fixture work around your hours, and the written estimate says when each area will be done.

Call NowGet a Quote