Key takeaways
- Passive infrared sensors see movement in their line of sight; ultrasonic and dual technology sensors also catch small motion around partitions.
- Where and how high the sensor mounts matters more than the brand.
- Most complaints about lights shutting off come from the wrong sensor type or a time delay set too short.
Occupancy sensor installation is the most common lighting control job in offices, and the one people notice when it goes wrong. The sensor has to see the people in the room, ignore the hallway, and wait long enough before switching off. This guide covers the choices for offices and the rooms around them, and our commercial electrical page covers the rest.
What types of occupancy sensors are there?
- Passive infrared (PIR) sensors detect movement of warm bodies in their line of sight.
- Ultrasonic sensors detect motion by sound waves and can see around partitions and stalls.
- Dual technology sensors use both and switch on with one, stay on with either.
PIR suits small private offices with a clear view of the desk. Restrooms with stalls and offices with tall partitions are where ultrasonic or dual technology sensors earn their place.
Occupancy or vacancy: which should we use?
An occupancy sensor turns lights on and off automatically. A vacancy sensor waits for someone to press the switch to turn lights on and only turns them off automatically, which saves more in rooms with daylight. The energy code that applies may favor one or the other in a given space; our post on commercial lighting controls covers the code side, and the Texas State Energy Conservation Office oversees the state's energy codes.
Where should an occupancy sensor be mounted?
A wall switch sensor works in a small office if the desk is in its view. In larger or oddly shaped rooms, a ceiling sensor placed over the work area sees more. Keep sensors from looking out an open door into a busy hallway, and away from air vents that can trigger ultrasonic models.
Why do the lights turn off while someone is in the room?
Usually the sensor cannot see the small movements of a person at a desk, or its time delay is too short. A PIR sensor behind a monitor or a partition loses sight of the hands on a keyboard. The fix is a better position, a dual technology sensor, or a longer delay, not disabling the sensor.
What does installation involve?
A wall sensor replaces the switch and often needs a neutral wire in the box. Ceiling sensors use a power pack above the ceiling. Both are electrical work under the National Electrical Code for a licensed contractor; TDLR licenses electricians in Texas. After installation, each sensor is set for its room and walked to confirm coverage.
What should I do next?
List the rooms, how each is used, and any where lights shut off on people today. Book a walk-through and you get a written price before any work starts. Planning chargers for staff too? Read about workplace EV charging.