Key takeaways
- Staff park for hours, so Level 2 chargers usually fit a workplace better than fast chargers.
- Load management lets more chargers share the electrical capacity the building already has.
- Run conduit for the next phase while the lot is open; adding it later costs more than the first chargers.
Workplace EV charging is a perk for staff and, for some businesses, a fleet need. The electrical questions are the same either way: how many chargers, how fast, and how much capacity the building has to give. This guide covers the planning, and our EV charger installation and commercial electrical pages cover the work.
Level 2 or fast charging for employees?
An employee parked for a full shift can recover a day's driving on a Level 2 charger. Fast chargers suit short stops, cost far more to install and need far more power. For most offices, clinics and shops, Level 2 is the right tool, and the money goes further on more ports.
How many chargers should a workplace start with?
- Count the staff who drive an EV today and ask who plans to in the next year or two.
- Start with enough ports for today's drivers plus a few, and plan the conduit for the next phase.
- Consider a sharing policy: moving cars at lunch can double what each port serves.
- Add a port or two for visitors or company vehicles if they need it.
How does load management help?
Load management lets chargers share a set amount of capacity, slowing each one when many charge at once. A workplace can install more ports without upsizing the service, because cars parked for eight hours rarely need full speed. The National Electrical Code covers EV charging equipment in Article 625, including how a managed system is sized.
Where should the chargers go?
Close to the electrical room or the panel that feeds them keeps the runs short. Consider the trenching or boring across the lot, the curbs and wheel stops that protect the chargers, the lighting at night, and accessible spaces. Run empty conduit to the future spaces while the pavement is open.
Think about access too. Chargers in a gated lot serve staff only; chargers near the entrance may draw visitors. Many networked chargers let the business set who can charge, when, and whether drivers pay, so the charger choice and the parking policy are made together rather than after the install.
Who needs to be involved?
Start with the building's capacity. In San Antonio, CPS Energy is the utility, and if a new service or a larger one is needed, that is planned with them early. The installation is electrical work by a licensed contractor; TDLR licenses electricians in Texas. For a leased space, bring the landlord in before the design.
What should I do next?
Count your drivers, note where they park, and find the electrical room. Book a site visit and you get a written price before any work starts. If the chargers go in alongside a lighting upgrade, read about commercial lighting controls too.