Workstations and furniture feeds
Desks get their power from the walls, the floor or the furniture system, and each route needs its own planning with the furniture installer. The circuit count comes from what plugs in at each desk, so copiers, kitchens and printers are not left sharing circuits with workstations.
- Wall, floor and furniture feeds
- Circuits counted from what plugs in
- Copiers and break rooms on their own circuits