Key takeaways
- Lighting controls turn lights off or down when nobody needs them: sensors, schedules and daylight dimming.
- Commercial energy codes require automatic controls in most new and renovated spaces, so a lighting project usually brings them in.
- Controls pair well with an LED retrofit and are cheaper to add while the ceiling is open.
Commercial lighting controls decide when the lights are on and how bright. In an office, a warehouse or a store, they can save as much energy as the LED fixtures themselves. They are also part of the energy code for new and renovated spaces. This guide covers the kinds of control and when each fits, and our LED lighting retrofit and commercial electrical pages cover the work.
What kinds of lighting controls are there?
- Occupancy sensors turn lights on when someone enters and off after the space is empty.
- Vacancy sensors need a person to switch the lights on, and turn them off automatically.
- Time switches and schedules turn whole areas off after hours.
- Daylight controls dim the lights near windows and skylights when daylight is enough.
- Networked controls tie fixtures and sensors together so settings change from one screen.
Does the energy code require lighting controls?
For most commercial buildings, yes. The Texas State Energy Conservation Office oversees the state's building energy codes, and commercial energy codes require automatic shutoff and other controls in most spaces of a new building and in many renovations. San Antonio's building-related codes, including its energy code, are in Chapter 10. Which controls a space needs depends on its use and the scope of the work, so the design starts with the code that applies.
Which control fits which space?
Private offices, restrooms, break rooms and storage rooms suit occupancy or vacancy sensors. Open offices and retail floors often run on schedules with local overrides. Warehouses gain from sensors on each high bay fixture, so only the aisles in use stay bright. Spaces with large windows gain from daylight dimming.
Can controls be added to existing fixtures?
Often. Wall sensors replace switches without touching the fixtures, and many LED fixtures accept a sensor or a wireless control module. The best time is during an LED retrofit, when every fixture is already being handled and the ceiling is open.
What about the wiring?
Sensors need power, and many wall sensors need a neutral at the switch box. Networked systems may add low voltage wiring, which is planned with the fixtures. The National Electrical Code governs both, and the work is done by a licensed contractor; TDLR licenses electricians in Texas.
After the install, the controls are commissioned: each sensor's coverage and delay, each schedule and each daylight zone is set and tested, and the settings are written down for the facility team. Controls that are installed but never tuned are the usual reason people tape over sensors or ask for them to be removed.
What should I do next?
List the spaces and how each is used through the day. Book a walk-through and you get a written price before any work starts. For the most common single control, read occupancy sensor installation.