Key takeaways
- On AEP Texas's secondary schedule for demand over 10 kW, the delivery charge is billed per kW of the highest 15 minute demand in the month.
- A premises that has reached 700 kW is billed transmission on 4CP, its average demand at the four ERCOT summer peaks of the prior year.
- The 80% ratchet applies to the distribution charge on primary service; on the secondary schedule the tariff applies it to certain riders only.
- Lighting that runs through the peak is part of it, so an LED retrofit can lower the kW the meter sees as well as the energy used.
AEP Texas demand charges are the part of a commercial delivery bill set by how hard a building pulls power at its busiest moment, not by how much energy it uses over the month. For most Corpus Christi businesses on AEP Texas, that moment is a single 15 minute window. This guide explains, from the AEP Texas Tariff for Retail Delivery Service, how that peak is measured, when the 4CP method and the 80% ratchet come in, and where an LED lighting retrofit fits. It describes the structure only; the tariff sets the rates.
What is an AEP Texas demand charge?
It is a delivery charge billed per kW of billing demand. AEP Texas's schedule for non-residential secondary voltage service with demand greater than 10 kW bills its distribution system charge on NCP kW billing demand, which the tariff defines as the kW supplied during the 15 minute period of maximum use in the month.
NCP stands for non-coincident peak: the building's own highest 15 minutes, whenever it happens, regardless of what the rest of the grid is doing. A single quarter hour of everything running at once can set that number for the month, even if the building spends the other days well below it. AEP Texas bills in kW, not kVA.
The schedule is Section 6.1.1.1.3 of AEP Texas's Tariff for Retail Delivery Service, linked from its rates page.
Who pays AEP Texas demand charges?
AEP Texas bills its delivery charges to the business's chosen retail electric provider, which passes them through on the bill the business pays. So the demand charge rarely shows up as a line from AEP Texas itself. It sits inside the retail bill, often as a pass-through delivery item, and the provider's statement shows how.
This only applies where AEP Texas is the utility. The City says AEP Texas serves the majority of Corpus Christi and that Nueces Electric Cooperative serves parts of Nueces County. A cooperative member's bill follows the cooperative's own rates and rules, so confirm the utility before reading a bill against the AEP Texas tariff.
The City's utility list is on its recover from disasters page.
When does the 4CP method apply to a business?
Once a premises has set an NCP demand of at least 700 kW in any earlier billing month. From then on the tariff bills it on 4CP kW: the average of its 15 minute demands at the times of the ERCOT system's monthly peaks in June, July, August and September of the previous calendar year.
4CP works differently from the monthly peak. It looks at four specific summer intervals chosen by the grid's peaks, not the building's. A large site that trims load during those four intervals changes the next year's transmission demand, while a site that runs flat out through them carries that number forward. Few Corpus Christi businesses reach 700 kW, but plants and large warehouses can.
Does AEP Texas use a demand ratchet?
On primary service, yes, for the distribution charge: the billing demand is the higher of the current month's NCP kW or 80% of the highest NCP kW in the prior 11 months. On the secondary schedule over 10 kW, the tariff applies that 80% ratchet to certain riders, not to the distribution charge.
The riders the secondary schedule names are the TC, NDC, SRC and ADFIT riders. The practical meaning of any ratchet is that one high month keeps counting for up to eleven more, at least in part. A business on primary service has the most reason to avoid a single unusual peak, because its distribution charge follows that peak for a year.
The primary schedule is Section 6.1.1.1.4 of the AEP Texas tariff.
Why does lighting matter to the demand peak?
Because lighting is usually on when the peak is set. In an office, store or warehouse the lights tend to run through the whole working day, so they sit underneath every 15 minute interval, including the highest one. Whatever kW the lighting draws is part of the number the demand charge is billed on.
Air conditioning, motors and process loads swing more and often decide when the peak lands. Lighting is the steady layer beneath them. Lowering that layer lowers every interval, so it lowers the peak too, without anyone having to change how the building operates on a busy afternoon. That is the link between a lighting retrofit and the demand line of the bill.
How does an LED retrofit change AEP Texas demand charges?
It cuts the kW the lighting draws, and that reduction carries into the 15 minute peak whenever the lights are on at peak time. The energy side falls too, because the same lights run for fewer kW every hour. How much either side moves depends on the fixtures, the hours and how the peak is set.
That is why we do not quote a savings figure before a survey. The working method is to count the fixtures and their wattage, record the hours each area is lit, look at the demand history on the bill, then compare the existing load with the replacement load. The result shows the kW and energy change, and the price is set after the free written estimate.
- A fixture count by area, with existing wattage.
- The hours each area is lit, including nights and weekends.
- Twelve months of bills showing billed demand and energy.
- The proposed fixtures and their wattage.
- Controls, such as occupancy sensors or daylight dimming, where they fit the space.
How can a business read its own demand history?
Start with twelve months of bills. A commercial bill on a demand schedule generally shows billed demand in kW for each month alongside the energy used. Lining those up shows which months set the highest peaks, whether the peak tracks the summer heat, and how far the highest month sits above the rest.
A flat line close to the top suggests a building that runs near its peak every day, where steady loads like lighting carry much of the weight. A line with one or two tall spikes points to an event: equipment starting together, a test, a one-time job. Each pattern calls for a different response, so read the pattern before deciding.
If the bills do not show demand clearly, the retail provider can usually supply the interval data behind them. Fifteen minute interval data shows exactly when each peak was set, which turns a guess about the cause into a short list of loads to look at on site.
What else can a business do about its demand peak?
Look at what starts at once. Large motors, compressors, cooling stages and kitchen or process equipment that switch on together can stack into a peak that lasts just long enough to count. Staggering start times or adding controls can flatten it. A load study shows which loads run in the highest intervals.
A load study for a service is also the starting point when a business adds equipment, because new load raises the peak as well as the service size. If a building is heading toward 700 kW, it helps to know before it crosses that line, since the 4CP method then applies. Any change to service entrance equipment is also something AEP Texas must be told about first.
For a new or larger service, see AEP Texas new commercial service. For lighting, see our commercial LED lighting retrofit Corpus Christi page, the Corpus Christi electrical company hub and our commercial electrical services.