Key takeaways
- A shunt trip breaker is a breaker with a coil that opens it when a remote signal arrives, from a fire system, an alarm or an emergency button.
- Commercial kitchen hoods, elevators protected by sprinklers and some IT rooms are the most common places a building needs one.
- The coil voltage, the signal wiring and a test with the fire alarm or suppression contractor all have to line up.
A shunt trip breaker is an ordinary circuit breaker with one addition: a coil that trips it open when it receives a signal from somewhere else. Buildings use them when power has to shut off automatically, by a fire system, or from an emergency button. They show up most often in restaurants and commercial kitchens. Our commercial electrical page covers the work.
How does a shunt trip breaker work?
The breaker still protects its circuit against overloads and short circuits the normal way. The shunt trip is an accessory coil inside or attached to it. When voltage reaches the coil, it pushes the trip mechanism and the breaker opens. Someone then resets it by hand at the panel, once the reason for the trip is cleared.
The coil needs power at the moment it trips the breaker, and the coil's rated voltage has to match the signal it receives. Many coils are made for a short pulse, so the circuit is often built with a contact that drops the signal once the breaker opens.
Why does a commercial kitchen hood need a shunt trip?
When a hood's fire suppression system goes off, the heat sources under the hood have to shut down. NFPA 96, the standard for commercial cooking ventilation, requires power to electric cooking equipment under the hood to shut off when the system discharges. On electric fryers, griddles and ranges, a shunt trip breaker is a common way to do that. Gas equipment is shut off by a gas valve instead.
Why do elevators use a shunt trip breaker?
Where sprinklers protect an elevator machine room or hoistway, the elevator's power is cut before water can flow onto the equipment. NFPA 72, the fire alarm code, and the elevator codes set out how that shutdown is triggered, and the National Electrical Code covers the disconnect. The shunt trip breaker, the heat detectors and the fire alarm wiring are planned together.
What is the difference between a shunt trip and an undervoltage release?
A shunt trip opens the breaker when a signal arrives. An undervoltage release does the opposite: it opens the breaker when its supply voltage drops or is lost. A shunt trip suits a fire signal or a button. An undervoltage release suits equipment that should not restart on its own after an outage.
How is a shunt trip breaker installed and tested?
The breaker has to be one listed for that panel, with the correct coil voltage, and the signal wiring runs from the fire system, alarm panel or button to the coil. We wire it and test it with the fire alarm or suppression contractor, so the whole chain is proven, not just the breaker. The National Electrical Code governs the wiring, and in Texas the work is done under a TDLR license. An emergency power off button for an IT room works the same way; our post on UPS installation covers that room.
What should I do next?
Send the panel schedule, the equipment the shunt trip must shut off, and the fire system contractor's contact. Book a site visit and you get a written price before any work starts.