Skip to content
Wattsmith Electric

Restaurants and commercial kitchens

Commercial kitchen electrical for San Antonio restaurants

Cooking lines, hoods, dish machines and walk-in coolers draw heavy, steady loads, and the code adds its own rules for a kitchen. We wire from your equipment schedule, plan the inspections around your opening date, and keep the kitchen running when something fails.

  • Licensed and Insured
  • BBB Accredited
  • Veteran Owned
  • TECL 41806

Tell us what is going on

Tap what you need, tell us when, and a real electrician calls you back.

Step 1 of 2

What do you need?
When works for you?

Sparks, burning smell, or a dead panel? Call (210) 446-5446 now instead of waiting on a callback.

We only use your number to call you back about this job.

By continuing, you agree that Wattsmith may call or text you back about your request.

You approve one flat price before any work starts. No hourly meter, no surprise invoice.

We hit your window. Miss it with no heads-up, and that is $149 off. The fine print

A Wattsmith electrician calls you back within 15 minutes during business hours.

What the work involves

What electrical work does a commercial kitchen need?

A commercial kitchen needs circuits built from each piece of equipment's cut sheet, a panel and feeder sized by load calculation, and hoods wired to work with their fans and make-up air. NEC 210.8(B) requires GFCI protection for kitchen receptacles, and each walk-in gets its own circuits so one failure does not take down another box.

Start from the equipment schedule

Every fryer, oven, dish machine and cooler has a cut sheet with its voltage, phase, load and connection. We build the circuit list and the load calculation from that schedule, so the panel and the feeder are sized for the kitchen you are actually opening. A unit swapped late is checked against its circuit before it is set.

  • Circuits from each cut sheet
  • Panel and feeder sized by load calculation
  • Late equipment changes checked before they are set

Hoods, exhaust fans and make-up air

The hood, its exhaust fan and the make-up air unit are wired so they work together, and the fire suppression system's shutdown of the cooking equipment is wired the way the suppression contractor's drawings show. That interlock is one of the first things an inspector tests.

GFCI protection in the kitchen

NEC 210.8(B) requires GFCI protection for receptacles in commercial kitchens, and it reaches equipment that plugs in near sinks and on the line. A GFCI that trips with every start of a piece of equipment is a sign of a fault or the wrong device, not something to bypass. We plan the protection with the equipment so it holds.

Walk-in coolers and freezers

Each walk-in's condenser and evaporator need their own circuits from the refrigeration contractor's sheets, so one failure does not take down another box. Losing a walk-in overnight costs product, which is why many kitchens put them on standby power.

Permit, inspections and the opening date

Inside the city limits the permit goes through the City of San Antonio Development Services Department under the 2023 NEC, adopted effective May 1, 2025. The rough-in, above-ceiling and final inspections are scheduled so they do not hold up the health inspection or the other trades, and the opening date sets the plan.

What goes wrong, and how we prevent it

Heat and grease dry out cords and loosen connections behind the line, and a loose connection carrying a fryer's load heats up every day until it fails. We use the cord and connection types the equipment calls for, and a maintenance agreement checks the connections behind the line on a schedule. When something fails during service, our emergency line answers 24 hours a day.

Questions about commercial kitchen electrical work? Call or get a quote.

Commercial quote

Can you send us your equipment list and opening date?

Send the equipment list if you have it, and your opening date. The owner responds the same business day.

Prefer to talk? Call (210) 446-5446.

Step 1 of 2

What do you need?
When works for you?

Sparks, burning smell, or a dead panel? Call (210) 446-5446 now instead of waiting on a callback.

We only use your number to call you back about this job.

By continuing, you agree that Wattsmith may call or text you back about your request.

You approve one flat price before any work starts. No hourly meter, no surprise invoice.

We hit your window. Miss it with no heads-up, and that is $149 off. The fine print

A Wattsmith electrician calls you back within 15 minutes during business hours.

FAQ

What do restaurant owners ask about kitchen wiring?

Straight answers. If you do not see yours, call us and ask.

Yes. NEC 210.8(B) requires GFCI protection for receptacles in commercial kitchens, and we plan it with the equipment so it holds rather than nuisance trips.

Call NowGet a Quote