Key takeaways
- A load bank is a portable or permanent bank of resistors that gives a generator a measured load to carry.
- Generators that are exercised lightly can build up unburned fuel in the exhaust, a problem called wet stacking, and never prove they can carry the building.
- NFPA 110 sets the monthly exercise for emergency power systems, and calls for a load bank test when the monthly runs do not reach enough load.
Load bank testing puts a standby generator under a real, measured load without using the building as the load. It is how an owner knows the generator will carry the building when the power fails. It matters most for diesel units that are exercised often but lightly. Our commercial standby generator page covers the installs, and our commercial electrical page covers the rest.
What is a load bank?
A load bank is a bank of resistive elements, cooled by fans, that turns the generator's output into heat. It lets a technician set the load in steps and hold it there. Portable load banks are brought in on a trailer or cart and connected for the test. Some sites install a permanent connection point so the hookup is quick and nobody has to open the generator's breaker enclosure.
Why do standby generators need load bank testing?
A weekly or monthly exercise often runs the generator with little or no load. A diesel engine that never gets hot enough can leave unburned fuel and soot in the exhaust, known as wet stacking. Over time that cuts power and can foul the engine. Light runs also never prove the generator, its cooling and its controls can carry the full load the building will ask of it.
What does NFPA 110 require?
For emergency and standby power systems it covers, NFPA 110 requires a monthly exercise under load. Diesel units are expected to run at not less than 30 percent of their nameplate kW rating, or at the exhaust temperature the maker recommends. When the monthly runs do not reach that, the standard calls for a load bank test once a year. Your authority having jurisdiction and your insurer may add their own requirements, so check what applies to your building.
What happens on a load bank test day?
- The load bank is connected at the generator's output or a permanent connection point.
- The building stays on utility power unless the test plan says otherwise.
- The load is raised in steps and held, while the technician records voltage, frequency, current, temperatures and pressures.
- The results go into a report, with anything that ran out of range.
Who does load bank testing?
The engine side, fuel and controls belong to the generator's service company. The electrical side, including a permanent load bank connection, the transfer switch and the wiring, is electrical work done under a TDLR license and the National Electrical Code. We often add the connection point so each later test is simpler and safer.
How does load bank testing fit with other inspections?
A load bank test proves the generator. It does not inspect the switchgear, the panels or the connections that carry its power. Many owners schedule it alongside a full building check; our post on a commercial electrical inspection covers that side.
What should I do next?
Send the generator's make, model and kW rating, how it is exercised today, and any past reports. Book a site visit and you get a written price before any work starts.