Key takeaways
- Keep panel rooms clear and locked, and keep every panel's circuit directory current.
- Arc flash warning labels belong on service equipment; a licensed contractor installs them.
- Infrared scans of gear under load find hot connections before they fail.
- Exit and emergency lights and standby generators need tests on a schedule, with a written record.
- Oncor handles the wires and outages; the retail provider handles the account and the energy price.
An electrical checklist for a Dallas property is mostly things a property manager can see without opening a panel: whether the electrical rooms are clear, whether panels are labeled, whether exit signs light. The rest is work to schedule with a licensed contractor: infrared scans, emergency lighting tests and standby generator tests. Storm season adds its own list, and knowing whether to call Oncor or the retail provider saves hours when the power goes out. This guide covers what to check, what to schedule, how to prepare for North Texas weather, who to call, and when the job belongs to a licensed electrician.
What belongs on a property manager's electrical checklist?
Two kinds of items. The first you can check on a walk: clear and locked electrical rooms, current panel labels, lit exit signs, no extension cords run as permanent wiring, and no scorch marks or warm covers. The second you schedule: infrared scans, emergency lighting tests, generator tests and a review before each storm season.
Write both lists down with dates. A walk each month takes little time and catches the things tenants change: boxes stacked in front of a panel, a door left propped, a cover plate missing. The scheduled items go on a calendar tied to the seasons, because Dallas weather sets the deadlines. When something on the walk looks wrong, the checklist's job is to get it to a licensed electrician, not to fix it.
Are the electrical rooms clear and locked?
They should be. The National Electrical Code requires clear working space in front of panels and switchgear so an electrician can work safely and anyone can reach a disconnect fast. Storage creeps into electrical rooms in almost every building, and it is the easiest item on the list to fix.
Check that nothing sits in front of the panels, that the door closes and locks, and that the room is not used for anything else. Water is the other hazard: a leak above a panel room or a roof drain near the service is worth a work order on its own. Keep the key where the maintenance staff and the electrician can get it, and keep a list of what each room serves, so nobody hunts for the right disconnect when a tenant's space goes dark.
Are panels and disconnects labeled?
Every panel should have a current circuit directory, and NEC Article 408 requires each circuit to be identified for its use. Disconnects should say what they feed. Service equipment should carry the arc flash warning label NEC 110.16 calls for, warning anyone who works on it while energized.
Directories go stale whenever a tenant space is rebuilt. If a panel's list still names a tenant who left years ago, it is wrong, and someone will open the wrong breaker. A licensed electrician can trace the circuits and rewrite the directory. We install the warning labels on equipment; an arc flash study, where the property needs one, is engineering work done by others, and we do not perform it.
When should equipment get an infrared scan?
On a schedule, with the equipment under normal load. An infrared camera shows connections running hotter than their neighbors, which is how a loose lug or a failing breaker shows up long before it fails. The scan has to be done with covers off and the gear energized, so it is a job for a licensed electrician.
Timing matters. A scan on a cool morning with the building half empty shows less than one on a summer afternoon with the chillers running. Ask for the report in writing, with an image of each hot spot, its temperature against the similar connections, and what the electrician recommends. Then track whether each item was fixed before the next scan, so the same hot spot does not show up twice.
Scans, labels and the tests below are the core of our Dallas maintenance agreements, set on a schedule with a written report after each visit.
Do the exit signs and emergency lights work?
Check them monthly by eye and test them on a schedule. Exit signs should be lit and readable, and emergency lights should come on when normal power fails. Emergency systems fall under NEC Article 700, which calls for testing and a written record of the tests and of any maintenance.
Many units have a test button that runs them on battery for a short time; a longer test shows whether the battery holds for the time it must. Write down each unit's location and its test results. Units that fail get replaced or rebuilt by an electrician, and the record shows anyone who asks that the tests were done. If the building's emergency lighting runs from a generator instead of batteries, the generator tests below cover it too.
How do you prepare a Dallas building for storm season?
By checking the outside gear before the weather comes. North Texas storms run all year: the weather service recorded ice up to half an inch across the region in early 2023, and its preliminary reports for April 27, 2026 describe hail up to teacup size, the largest in northeast Dallas.
Before spring and before winter, walk the meter bases, weatherheads, outdoor disconnects and rooftop equipment for damage, open covers and loose conduit. After the May 2024 storm, Oncor said a damaged meter base or weatherhead must be fixed by an electrician before power is restored, and that city inspections may be required first. Know which contractor you will call before the storm, not after.
Sources: NWS Fort Worth on January and February 2023 and April 2026 (preliminary), and Oncor's May 29, 2024 restoration update.
How often should a standby generator be tested?
On the schedule its code article and its maker set. Systems under NEC Articles 700 and 701 call for periodic testing with written records, and optional standby under Article 702 is worth testing the same way. A generator that has not run under load in months is a guess, not a backup.
A test should start the generator, transfer the load and run it long enough to show the engine and the transfer switch both work. Record the date, the run time and anything that went wrong. Fuel matters too: a diesel tank needs checking, and a natural gas unit depends on the gas supply. Time a full test before spring storms and before the first freeze, when the system is most likely to be needed.
Who do you call: Oncor or the retail provider?
Oncor for the wires, the retail provider for the account. In Dallas, Oncor delivers the power and owns the poles, lines and meters; the retail provider sells the energy and sends the bill. Outages, downed lines and meter problems go to Oncor. Billing, contracts and the energy price go to the retail provider.
The Public Utility Commission notes that it regulates the delivery utility's rates but not the price retail providers charge. When a new meter is set, Oncor provides an ESI ID and the customer chooses a retail provider before service starts. Keep both numbers with the account's ESI ID on the checklist. When damage is on the customer's side of the meter, the call after Oncor is a licensed electrical contractor.
Sources: the PUC guide to understanding your bill, Oncor's new construction page and Oncor's Tariff for Retail Delivery Service.
When should a property manager call a licensed contractor?
Whenever the fix means opening a panel, touching wiring or restoring power. TDLR says anyone who performs electrical work in Texas must be licensed, and after the 2024 storms it reminded the public that the work must go through a TDLR-licensed contractor, with any required city permit in place first.
Dallas adds its own rules. Chapter 56 bars anyone from the business of electrical contracting without city registration, and a contractor's permitting and inspection privileges stop at midnight on the day the registration or the insurance expires. After storm, vehicle, fire or meter damage, a licensed contractor registered with the city can request an emergency power release before inspection, which the inspector may grant, and then obtains the permit. Check a contractor yourself on TDLR's license search before the work starts. We register with the City of Dallas before a permit is bought, as the city requires.
Check a license with TDLR's license search. Sources: the TDLR electricians FAQ, TDLR's May 22, 2024 notice, Chapter 56 as amended by Ordinance 33081 and the city's Emergency Electrical Release Policy.
If the checklist turns up standby work, our guide to commercial generator installation in Dallas covers it, and our guide to what an electrical contractor bid includes shows how to read the scope you get back. See also the Dallas commercial electrician hub and our commercial electrical services. The price of any work is set after the free written estimate.