Key takeaways
- A tenant's departure leaves dead ends: open boxes, abandoned equipment circuits, and a panel directory that no longer matches.
- A make-ready makes the space safe and accurate: circuits terminated, panels labeled, exit and emergency lights working.
- It is not a build-out. The goal is a clean, honest starting point for the next tenant's work.
A vacant suite electrical make-ready is the work a landlord does between one tenant moving out and the next one signing. The outgoing tenant's equipment leaves, but its wiring often stays, and so do the open boxes, the dead circuits and the labels that no longer mean anything. A make-ready puts that right, so the space shows well and the next tenant build-out starts from the truth.
What does a tenant usually leave behind?
- Circuits for equipment that left: a server rack, a dental chair, a salon dryer, a sign.
- Open junction boxes and loose wire ends where fixtures or furniture feeds came out.
- Low voltage cable for phones and data, abandoned above the ceiling.
- A panel directory that names rooms and machines that no longer exist.
- Exit signs and emergency lights with dead batteries, or missing after a wall moved.
What does a make-ready fix?
It makes every circuit either useful or safely gone. Abandoned equipment circuits are terminated at the panel or the box, with the wire ends capped inside closed boxes. Open boxes get covers. Damaged receptacles and switches are replaced like for like. Each panel gets a directory that matches what is actually there. Lighting in the suite works, so a broker can show it in daylight or at dusk.
Why does the panel directory matter so much?
Because the next tenant's electrician starts there. A directory that says "dentist chair 3" for a circuit that now feeds a hallway light costs hours of tracing on every future call, and it is a safety problem when someone shuts off the wrong breaker. Our guide to the commercial panel schedule explains what a good one looks like.
What about exit signs and emergency lights?
They must work whether the suite is leased or empty. A vacant suite is still part of the building's means of egress, and a fire inspector or an insurer will not care that nobody works there. Test every unit, replace dead batteries and lamps, and make sure the signs still match the exit paths. Our emergency lighting inspection checklist is the list we use.
Is a make-ready the same as a build-out?
No. A make-ready does not add circuits or change the layout. It leaves the space safe, accurate and clean. A build-out designs the electrical around the new tenant's use, with drawings and a permit. Keeping the two separate means the landlord spends on what every tenant needs, and the tenant pays for what only they need.
Does a make-ready need a permit?
Most make-ready work is repair and maintenance: replacing devices like for like, covering boxes, terminating dead circuits. When the work grows into new wiring, it becomes permitted work, pulled by the licensed electrical contractor. Our guide to how commercial electrical permits work in San Antonio explains the line, and the City's code is in Chapter 10 of its city code.
What should a landlord do next?
Walk the suite with our commercial electrical team the week the tenant leaves. You get a written list and a written price before the work starts, and a panel directory you can hand to the next tenant's team. If the next tenant is a restaurant, our post on walk-in cooler electrical requirements shows what their build-out will ask of the space.