Key takeaways
- CPS Energy measures demand as the highest 15-minute kW reading in the month.
- On General Service (PL) there is no per-kW demand charge; billing demand shapes the energy blocks and the minimum bill, with an 80% winter ratchet on the prior summer peak.
- Large Lighting and Power (LLP) and Extra Large Power (ELP) carry per-kW demand charges with separate summer and non-summer prices and billing floors of 100 kW and 1,000 kW.
- The rate sheets effective February 1, 2024 are still the latest; a FY2027 increase is only projected.
- Lighting that runs through the afternoon peak counts toward demand, so an LED retrofit can lower both energy and the measured peak.
CPS Energy demand charges are often the least understood line on a San Antonio commercial bill. A building is billed for the energy it uses and, on most commercial rates, for its highest short burst of power in the month. This guide explains how CPS Energy measures that peak, how its General Service, Large Lighting and Power and Extra Large Power rates treat it, why a summer peak follows a building into winter, and where lighting and an LED retrofit fit in. It describes the structure only, from CPS Energy's own rate sheets.
What is a demand charge on a CPS Energy bill?
Demand is the rate at which a building draws power, measured in kilowatts, as opposed to energy, the total kilowatt-hours used over the month. CPS Energy reads demand as the kW from its demand meter for the 15-minute period of the customer's greatest demand reading during the month. On some rates that peak is billed per kW.
The point for an owner is that one busy quarter hour sets the demand for the whole month. A building that runs steadily and a building that spikes once can use the same energy and still show very different demand. Anything that runs during that peak quarter hour, from chillers to lighting, counts toward it.
CPS Energy is the City of San Antonio's utility and the only retail electric provider in its area, so these sheets are the rates that apply. See its rates page.
How does CPS Energy's General Service rate treat demand?
The General Service Base Commercial Electric Rate, called PL, measures demand the same 15-minute way but has no per-kW demand charge. Instead, billing demand above a small threshold enlarges the block of kilowatt-hours billed at the first energy price, and it sets the minimum bill. A power factor test below the sheet's threshold can raise billing demand.
So on PL a lower peak does not remove a line item, but it does change how the month's energy is billed and where the minimum bill lands. That is why the rate sheet matters before any savings claim is made: the same kW reduction is worth different things on PL than on a rate with a per-kW charge.
Read CPS Energy's General Service (PL) rate sheet, effective February 1, 2024.
Why does a summer peak follow a building into winter?
Because of the ratchet. On the General Service rate, billing demand from October through May is the month's own demand or 80% of the highest demand measured during the previous June through September, whichever is greater. The Large Lighting and Power rate carries an 80% ratchet on the prior summer peak among its billing demand tests too.
In practice, one hot afternoon in August can set a floor under billing demand for the eight months that follow. It also means a load reduction that lowers the summer peak keeps working through the winter months, because it lowers the number the ratchet is taken from.
How do LLP and ELP bill demand?
The Large Lighting and Power rate, LLP, bills a demand charge per kW of billing demand, with one price for summer billing, June through September, and another for non-summer billing, October through May. Its billing demand has a 100 kW floor among its tests, alongside the 80% ratchet on the previous summer's peak.
The Extra Large Power rate, ELP, applies to a customer served at one point of delivery through one meter whose monthly load is greater than 1,000 kW. It also has summer and non-summer per-kW demand charges, and a billing demand floor of 1,000 kW. On these two rates, a kW taken off the peak shows up directly on the demand line.
- PL: 15-minute demand, no per-kW demand charge, 80% winter ratchet.
- LLP: per-kW demand charge, summer and non-summer prices, 100 kW floor, 80% ratchet.
- ELP: for monthly load over 1,000 kW, per-kW demand charge, summer and non-summer prices, 1,000 kW floor.
Read the LLP rate sheet and the ELP rate sheet.
Are the 2024 CPS Energy rate sheets still current?
Yes, as of this writing. CPS Energy's rates page and its April 2026 quarterly update name the base rate increase effective February 1, 2024 as the most recent. The quarterly update says CPS Energy projected a preliminary base rate increase for its FY2027 budget, and that the timing and amount remain subject to ongoing evaluation.
That projected change is not a rate until it is approved, so any calculation should use the sheets in effect and be rerun if they change. The structure described here, the 15-minute peak, the ratchet and the summer and non-summer split, is what to plan around.
See CPS Energy's quarterly update for the quarter ending April 30, 2026.
How does lighting add to a building's peak demand?
Lighting is usually on during the hours a commercial building hits its peak. In an office, store or warehouse the lights run through the afternoon, when cooling load climbs. Every kW of lighting on during that peak quarter hour is part of the demand reading, so lighting is part of the peak, not only the energy.
That makes lighting one of the few peak loads an owner can cut without changing how the building operates. Cooling and process loads depend on weather and production. Lighting depends on the fixtures, how many there are and how long they run, all of which a lighting audit can count.
How does an LED retrofit change CPS Energy demand charges?
An LED retrofit replaces fixtures with ones that draw fewer watts for the light needed. If those fixtures run during the peak quarter hour, the drop in lighting kW lowers the measured peak. On LLP and ELP that shows on the per-kW demand line; on PL it changes the energy blocks and the minimum bill.
How much that is worth is worked out, not assumed. An audit counts the fixtures, the watts each draws, the hours they run and whether they are on during the peak. The difference in kW and kWh is then priced against the building's own rate sheet and its last twelve months of bills, with the ratchet in mind. Controls such as occupancy sensors cut hours, which saves energy but may not lower the peak.
- Fixture count and type, by area.
- Watts per fixture, before and after.
- Operating hours, and whether the lights are on at the monthly peak.
- The building's CPS Energy rate and its twelve months of bills.
Who should work out the numbers on a retrofit?
Someone who counts the fixtures on site and reads the actual rate sheet. A retrofit price and its payback are set after a free written estimate based on that count, the building's rate and its bills. We do not quote savings before the audit, because the same retrofit is worth different amounts on PL, LLP and ELP.
We do commercial lighting retrofits across San Antonio, with license TECL 41806. The bills are the starting point: twelve months of them show which months set the peak, how the ratchet carried it, and which rate the account is on. With those in hand, the audit can say how much of the peak is lighting, and the estimate can show the work behind every number it uses.
A larger retrofit can also touch the permit and code questions covered in our guides to how commercial electrical permits work in San Antonio and the San Antonio electrical code. See our LED lighting retrofit work and commercial electrical services.