Key takeaways
- Austin Energy counts a peak of more than 170,000 customers without power in Winter Storm Mara, on February 1, 2023, and set a system-wide restoration time of February 12.
- The National Weather Service office for Austin and San Antonio calls Mara the worst pure ice storm in the region in several decades.
- In Winter Storm Uri, about 220,000 Austin Energy customers lost power at different points during a four day ERCOT load shed.
- A standby generator that never runs in parallel with the grid, other than brief transfer switching, is outside Austin Energy's interconnection procedure.
- Parallel systems from 50 kW to under 1 MW need an automatic sync-check relay or an open transition transfer switch, by Austin Energy's guide.
Standby power for an Austin business has to be planned around ice as well as heat. Winter Storm Mara coated the city in February 2023 and left more than 170,000 Austin Energy customers without power at its peak, two years after Winter Storm Uri cut power in rotation across Texas. Buildings with their own generator and transfer switch kept their chosen circuits running through both. This guide sets out what Austin Energy, the National Weather Service and ERCOT recorded, what a commercial standby system is, which code articles govern it, and what Austin Energy asks before a generator connects to a building it serves.
What did Winter Storm Mara do to Austin Energy's system?
Austin Energy's after-action report calls Mara a catastrophic, hurricane-level ice storm. It counts a peak of more than 170,000 customers without power, 10.5 million trees damaged and 370,000 calls to its call center. The peak came on February 1, 2023, the same day the storm swept through, and reached 32% of customers.
Ice did the damage. The report records more than half an inch of ice across the eastern service area and more than seven-tenths of an inch in the west, one of the highest amounts in Austin's history. Before the response was over, the utility had replaced 101 distribution poles and 52 transformers, with more than 1,600 people in the field, including 455 mutual aid personnel, the most in its history.
Restoration ran well past a week. On Sunday, February 5, near the end of its first phase of restoration, Austin Energy announced a new system-wide restoration time of Sunday, February 12. A business on a damaged circuit spent those days with no firm date for power, which is the situation a standby system is built for.
Sources: Austin Energy's February 2023 Winter Storm Mara After-Action Report and its history page, which repeats the three headline figures.
How did the National Weather Service describe the 2023 ice storm?
The National Weather Service office for Austin and San Antonio calls it the worst pure ice storm in the region in several decades. Its record of local weather events lists 0.25 to 0.6 inch of ice on trees and power lines across the Austin metro and nearby Hill Country, with outages in the hundreds of thousands.
The weather service measured the ice its own way, and its range differs from the utility's, so each figure is quoted here with its own source. The lesson for a building owner does not change between them: the ice built up over a single morning and afternoon on February 1, and the weather service says some of the outages that followed lasted a week or more.
Source: NWS Austin/San Antonio, Weather Highlights Since 1899.
What did Winter Storm Uri show Austin businesses?
That power can go out with no line down at all. Austin Energy's report on the February 2021 storms says about 220,000 of its customers were without power at different points, some for several days, during a load shed that ERCOT ordered and that lasted four days. The shortage was in supply, not in the wires.
The same Austin Energy report states that ERCOT's progressive load shed culminated in 20,000 MW on February 15, 2021. ERCOT's own documents describe the supply side. Its March 24, 2021 statement to a U.S. House committee says the storm took out 48.6% of the generation available to ERCOT at its worst, and that without controlled outages power could have been out for 90% of Texans for weeks. Its generator outage report puts unavailable capacity at its highest, 52,037 MW, at about 8:00 AM on February 16.
Austin Energy's report adds a point aimed at large commercial and industrial customers. During the storms, it and the City were called on to find fuel sources for backup generators, or to restore power to specific customers, to limit risk to public safety. The report says customers are responsible for managing the risks of any hazardous materials on site during outages and for meeting their own regulatory obligations. For a business carrying that duty, a standby system with a fuel plan is how it is met.
Sources: Austin Energy's February 2021 Winter Storms After-Action Report, ERCOT's March 2021 statement to Congress and its generator outages by cause report.
Do storms other than ice cut power in Austin?
Yes. Austin Energy's report on the May 28, 2025 microburst describes a supercell with wind gusts up to 90 mph and hail as large as 1.5 inches. More than 72,000 customers lost power at the peak, and the utility ranks it the second most destructive weather event in its history for direct infrastructure damage.
The strongest winds ran in a narrow swath from north and northwest Austin through central and east Austin to the airport, where a 77 mph gust was recorded. Over the whole restoration, 124,000 customers were affected, and crews restored everyone who could safely take power within four days. A standby plan in Austin covers spring thunderstorms as well as February ice.
Source: Austin Energy's 2025 May Microburst Storm After-Action Report.
What is a commercial standby system?
A commercial standby system is a generator, a transfer switch and the wiring that moves chosen loads onto the generator when utility power fails. The transfer switch senses the outage, starts the generator and shifts the loads over, then returns them to Austin Energy's supply once it is back and holding steady.
The generator is sized from the loads the owner decides to keep, not from the size of the electrical service. A load study lists them: refrigeration, network and phone equipment, security and alarm power, enough lighting to move safely and, in a freeze, heat for the core of the building and anything protecting water and sprinkler piping. Those circuits move to a standby panel, or the switch sits at the service with controls that shed whatever the generator cannot carry. Fuel belongs in the same plan, natural gas where the building has it, or stored fuel sized to the outage the owner wants to ride through.
Which NEC articles cover standby power?
Three, depending on why the power is needed. Article 700 covers emergency systems that protect life, such as egress lighting. Article 701 covers legally required standby, where a government agency demands the backup. Article 702 covers optional standby, which an owner chooses to protect the business. Most business generators are optional standby.
The duties differ by article. Emergency systems under 700 have 10 seconds to restore power and must keep their wiring apart from ordinary circuits. Legally required systems under 701 have up to 60 seconds. Optional systems under 702 leave sizing and load choice to the owner, provided the generator can serve the load its transfer equipment can connect. A single building may need a 700 branch for its exit lighting and still want a separate 702 system for coolers and servers.
What does Austin Energy require before a generator is connected?
It turns on whether the generator ever runs in parallel with the grid. Austin Energy's interconnection guide says emergency and standby systems under NEC Articles 700 through 702 that are not in parallel with its system, other than brief transition switching, do not follow its interconnection procedure. Parallel operation longer than about 1 second does.
That guide covers customer-owned generation under 10 MW. It says any closed transition switching, where generator and grid are tied for a moment so the load sees no blink, requires synchronizing controls. Parallel systems off the Downtown Network rated at least 50 kW and under 1 MW must also have an automatic sync-check relay, where the generator is synchronous or self-commutated, or an open transition transfer switch. Austin Energy's Design Criteria adds that each request to interconnect customer-owned generation is reviewed and approved individually.
Most business standby systems are built open transition: the switch breaks from the utility before it makes to the generator, so the two never run together, and the job stays outside the interconnection procedure. When an owner wants closed transition for loads that cannot tolerate a blink, the design goes to Austin Energy for review before the switch is ordered.
Sources: Austin Energy's Distribution System Interconnection Guide and its Design Criteria.
How is a standby system permitted and priced in Austin?
The City of Austin permits the electrical work, and its inspectors see the wiring before cover and at final. Only a registered trade contractor may apply for a stand-alone electrical permit, so Wattsmith registers with the City before a permit is bought, as the City requires. The price of the system is set at the free site visit.
At the visit we walk the building with the owner, list the loads to keep, look at the service and where a generator and switch can sit, and check the fuel on hand. The written estimate then names the generator size, the transfer equipment, the wiring and the permit work. Wattsmith Electric works under Texas electrical contractor license TECL 41806. Once the system is in, it should run under load, with the switch carrying the building, before each summer peak and again before the first freeze.
We install systems like these as Austin commercial standby generators, and keep them tested under Austin commercial maintenance agreements. The inspections the job passes are laid out in the Austin electrical inspection sequence. For the rest of our work in the city see the Austin commercial electrician hub, and for all of Texas our commercial electrical services. Permit source: the City's stand-alone permit page.