Skip to content
Wattsmith Electric

Commercial

Vetting a Fort Worth Electrical Company: Checks You Can Run Yourself

November 1, 2026Last updated 5 min readWattsmith Electric · TECL 41806

Key takeaways

  • Look up the company's Texas electrical contractor license on TDLR's License Search; the state requires it for anyone doing electrical work.
  • Every Texas electrical contractor employs a licensed master electrician; ask who it is and look that license up too.
  • Fort Worth requires a contractor registration on file before a permit is issued, renewed each year, with insurance naming the City as additional insured.
  • A written scope says what is included, what is not, and who pulls the permit and books the inspections.
  • Ask who handles Oncor or the co-op: the utility will not connect until the city approves the installation.

Vetting an electrical company in Fort Worth does not take inside knowledge. Most of what a property manager, owner or tenant needs to know can be checked in an afternoon: the state license, the master electrician behind it, the city registration, the insurance certificate, and whether the proposal is a real written scope. The rest comes from a few direct questions about permits, inspections and the utility. This guide lists those checks in the order we would run them on any contractor, ourselves included, with the official pages where each one can be confirmed.

How do you check an electrical company's Texas license?

On the Texas Department of Licensing and Regulation's License Search. TDLR says anyone who performs electrical work in Texas must be licensed. Search the company name or license number, and confirm the license is an electrical contractor license, that it is active, and that the name matches the company on the proposal.

A state license is valid anywhere in Texas, so a contractor based in another city can work in Fort Worth on the same license. TDLR also says a city may not make a state licensee take a municipal exam. The check is the same for every bidder, wherever it is based. Wattsmith Electric holds Texas electrical contractor license TECL 41806, and that number can be looked up the same way.

Sources: TDLR's License Search and the TDLR electricians FAQ.

Who is the master electrician behind the company?

Ask for the name, then look that license up too. TDLR requires an electrical contractor to employ a licensed master electrician, who may also be the owner. A master electrician may be assigned to only one electrical contractor, unless he owns more than half of the contracting business.

The master license is earned on the job. TDLR requires at least two years as a licensed journeyman and 12,000 hours of on-the-job training before a master license is issued. Knowing who holds it tells you who answers for the work under the company's license. On a commercial job it is fair to ask whether that person, or a journeyman working under the license, will lead the crew on site.

Sources: TDLR's electrical contractor license page and its master electrician license page.

What does Fort Worth require before a contractor can pull a permit?

A valid contractor registration on file with Development Services. Fort Worth says anyone obtaining a permit under its electrical provisions must have one, with narrow exceptions for homeowners on their homestead and commercial owners installing banners. The city's development guide says a contractor must be registered before the permit is issued.

For an electrical company the registration rests on three things the city lists: a valid Texas electrical contractor license, a certificate of liability insurance that names the City of Fort Worth as an additional insured, and a term of one year from issuance. Ask a bidder whether its registration is current, or when it will register for your job. We register with the city before a permit is bought, as the city requires.

Sources: the city's contractor registration page and the 2025 Commercial Development Guide, page 34.

What insurance should an electrical company carry?

At least the business liability insurance the state requires. TDLR says electrical contractors must maintain the required limits of business liability insurance. Ask for a certificate of insurance made out for your project, check the policy dates, and confirm the named insured matches the licensed company on the proposal.

Owners and landlords often ask to be named as additional insured on the certificate, the same way Fort Worth asks for itself on the registration. Workers' compensation coverage for the crew is a common lease and contract requirement too. A certificate requested straight from the agent, rather than a copy pulled from a file, shows the coverage in force today. If your lease or your lender sets insurance terms for contractors, hand them to every bidder at the start.

Source: TDLR's electrical contractor license page.

What should a written scope include?

Enough detail that two people reading it would build the same thing. A written scope names the work by area and system, lists the major equipment, says what is excluded, names who pulls the permit and books inspections, and states any assumptions about the existing service, the schedule and site access.

  • The work, by area or system: service, distribution, branch circuits, lighting, controls, low voltage pathways.
  • Major equipment by type and rating, and who supplies it.
  • Exclusions in plain words, such as patching, painting, utility charges or work by other trades.
  • Permits and inspections: who applies, who schedules, who meets the inspector.
  • Assumptions about the existing service, working hours and site access.

Comparing bids is easier when each one answers the same list. A short proposal is not wrong in itself, but one that leaves exclusions unstated tends to surface them later as change orders. Ask every bidder to price the same drawings or the same written description. Where there are no drawings yet, a walk through the building with each bidder, using the same list of needs, puts every proposal on the same footing. A bidder who asks about the existing service, the panel schedules and the hours the building is occupied is pricing the job you have, not a generic one.

Who should pull the permit and book the inspections?

The electrical contractor doing the work. In Fort Worth the permit holder needs a valid registration, so the company you hire should apply through Accela Citizen Access in its own name. It should also request the inspections, through Accela or the city's inspection line, and be the inspection contact the city reaches.

Fort Worth asks that the inspection contact be filled out in the online profile for every scheduled inspection, and schedules requests received before 6:30 a.m. for that day. A company that books its own inspections and meets the inspector carries the job through each stop instead of leaving it to the owner. TDLR's own advice after the May 2024 storms was to make sure the contractor has any required permit from the city or county before work begins.

Sources: the city's permits page, the Fort Worth inspections page, and TDLR's May 22, 2024 release.

Who coordinates with Oncor or the co-op?

Ask each bidder directly. Most Fort Worth addresses are served by Oncor; some edge areas are co-op territory, and the city's own development guide lists co-ops among its utility contacts. Either way, the utility will not connect a new or changed service until the city approves the installation.

On an Oncor job that needs new poles, wire or transformers, the request starts online, and an Oncor Project Manager follows it. A contractor who knows that process can fill out the load forms, mark the site plan and keep the utility's dates tied to the city's inspections. Oncor's tariff says it will not interconnect until it is notified that the proper authority approved the installation, so the permit and the utility move together.

Sources: Oncor's new construction page, its Tariff for Retail Delivery Service, Section 5.4.2, and the PUC's FAQ on municipal utilities and co-ops.

Once the work is in, an electrical maintenance agreement in Fort Worth keeps the same company on the building's equipment. For how a build-out scope divides between landlord and tenant, see our guide to tenant build-out electrical work in Fort Worth. See also the Fort Worth commercial electrician hub and our commercial electrical services. Our price is set after the free written estimate.

FAQ

Common questions

Straight answers. If you do not see yours, call us and ask.

Where do I look up an electrical company's Texas license?

On TDLR's License Search at tdlr.texas.gov. Confirm it is an active electrical contractor license in the same name as the company on the proposal.

Does an electrical company need a Fort Worth registration?

Yes, to pull a permit. The city requires a valid contractor registration on file before a permit is issued, renewed one year from issuance.

What insurance does a Fort Worth registration require?

A certificate of liability insurance naming the City of Fort Worth as an additional insured, along with a valid Texas electrical contractor license.

Ready to get it handled?

Flat-rate pricing quoted up front. Licensed and insured. A Wattsmith electrician calls you back within 15 minutes during business hours.

  • Licensed and Insured
  • BBB Accredited
  • Flat-Rate Pricing
  • Background-Checked
Call NowGet a Quote