Skip to content
Wattsmith Electric

Commercial

Choosing a Commercial Electrical Contractor in Houston: Checks You Can Run Yourself

November 1, 2026Last updated 6 min readWattsmith Electric · TECL 41806

Key takeaways

  • Look up the contractor's license yourself on TDLR's license search; a Texas electrical contractor must employ a licensed master electrician.
  • Houston requires every electrical contractor to register with the city's Electrical Inspections section, and registration runs one year at a time.
  • Ask for proof of business liability insurance; TDLR requires electrical contractors to keep it at the required limits.
  • Get a written scope and schedule that names who buys the permit, who books each inspection and who handles CenterPoint.

Choosing a commercial electrical contractor in Houston is easier when you know which facts are public. A search for electrical companies returns a long list, and most of them will say they offer commercial electrical services. The state and the city both publish what a contractor must hold before it can work on your building, and you can check most of it yourself in a few minutes. This guide sets out those checks in the order we would run them as a buyer, with the official pages behind each one.

What should you check first when hiring a commercial electrical contractor?

Start with the state license. TDLR says anyone who performs electrical work in Texas must be licensed, and an electrical contractor must employ a licensed master electrician to hold its contractor license. Ask for the contractor license number, look it up yourself, and confirm the business name on the license matches the one on the bid.

A matching name matters more than it sounds. The license belongs to a business, and the master electrician behind it is the person responsible for the work that business does. TDLR assigns a master electrician to only one electrical contractor, unless that master owns more than half of the business. If the bid comes from one company and the license from another, ask why before going further.

How do you look up a Texas electrical contractor license?

TDLR runs a public license search. Choose the electrical license type, enter the license number or the business name, and the result shows whether the license is active. Our own license is TECL 41806, and you are welcome to look it up the same way you would check anyone else's before signing.

  • The license type: an electrical contractor license, not only an individual electrician's license.
  • The status: active, not expired or inactive.
  • The business name, matched against the name on the bid and the insurance certificate.
  • The master electrician of record, whose own license should also be active.

The search is at TDLR's license search, and the contractor rules are on TDLR's electrical contractor license page.

Why does Houston city registration matter?

Houston requires any person or business that wishes to do electrical work in the city to register, and the city's code ties contractor registration to a valid state contractor license. Registration is handled by the Electrical Inspections section and is valid for one year, so the question is whether it is current today, not whether it existed once.

The registration is what lets the contractor buy your permit and call your inspections. The city asks for copies of the state master and contractor licenses and a notarized form CE-1189. Since April 1, 2022, a master electrician of record may be on only one contracting business's city registration. TDLR's FAQ says a state license is valid anywhere in Texas, and Houston still requires the registration on top of it. We register with the City of Houston before any Houston permit is bought, as the city requires.

The requirements are on the city's Electrical Contractor Registration page and its Electrical Inspections page. The statewide rule is in TDLR's electricians FAQ.

What insurance should a commercial electrical contractor carry?

TDLR says electrical contractors must maintain the required limits of business liability insurance, so a licensed contractor should be able to send a certificate without delay. Ask for it before work starts, check that the insured name matches the license, and ask your own insurer or property manager what limits and endorsements your building's contracts require.

Many commercial leases and owner contracts set their own insurance terms for anyone working in the building. Those terms come from your lease or your lender, not from the state, so read them before you request bids and send them with the drawings. A contractor who sees them early can confirm coverage in the bid instead of after award.

What belongs in a written scope and schedule?

A written scope says what is being installed, what is excluded, who supplies each piece of equipment, and which drawings it rests on. The schedule says when each stage starts and what it waits on. Together they let you compare bids line by line instead of comparing totals that cover different work.

  • The drawings and revision dates the bid is based on.
  • Every panel, feeder, fixture type and device the contractor will furnish and install.
  • Exclusions, written out, so nothing is assumed.
  • Owner-furnished equipment, if any, and who receives and stores it.
  • The stages of work and what each one depends on.
  • Who buys the permit, who books inspections and who handles CenterPoint.

Who pulls the permits and books the inspections?

The electrical contractor does both. Houston's code says only a licensed and registered electrical contractor may obtain an electrical permit, and on a commercial job the trade permit is bought after the building permit is sold. The city says the licensed contractor doing the work schedules the required electrical inspections, online or through its IVR line.

To schedule inspections, the master and contractor registrations must both be in good standing, which is one more reason the registration check above matters. The city's code says Electrical Inspections shall endeavor to inspect within three working days of a request. A contractor who books each inspection as soon as that stage is ready keeps that window from stacking up behind the drywall crew.

The permit order is in the city's Commercial Permitting 101 presentation, and the permit and inspection rules are in the City of Houston Electrical Code. For how scope and inspections line up on a lease space, see tenant build-out electrical scope and timeline.

How does the contractor coordinate with CenterPoint?

CenterPoint Energy delivers power across the Houston area, and it connects a new or changed installation only after approval or a permit number from the proper authority reaches its Permit Desk. Projects that need CenterPoint construction, such as a new transformer, go through its online Electric Service Request. Your contractor should say in writing who files it.

Commercial business owners and builders can call CenterPoint to have an ESI ID created for a new service point, and CenterPoint says a local service consultant reaches out within two business days of a construction request. None of that replaces the city's release, so the contractor's schedule should show the CenterPoint request and the final inspection as two separate lines.

CenterPoint describes the steps on its service connect page.

When does a maintenance agreement make sense?

A maintenance agreement makes sense once the building has equipment that needs regular attention, such as switchgear, a standby generator or a large lighting system. It sets the visits, what is checked at each one, and how findings are reported, so upkeep happens on a schedule instead of after a failure.

The same checks apply to the contractor on an agreement as to one on a single project, and they are worth repeating each year because the city registration renews annually. Ask for the written list of tasks at each visit and how findings come back to you, so you can hold the agreement to what it says.

See our Houston commercial maintenance agreements page, the Houston commercial electrician hub and our commercial electrical services. If a standby unit is part of the plan, standby generator sizing for Houston business covers how one is sized.

How does Wattsmith work in Houston?

We are a veteran-owned Texas electrical contractor, license TECL 41806, and we work Houston from San Antonio on commercial, industrial and commercial standby jobs. We register with the City of Houston before any Houston permit is bought, and each job starts with a free written estimate that sets out the scope.

FAQ

Common questions

Straight answers. If you do not see yours, call us and ask.

Where can I look up a Texas electrical contractor's license?

On TDLR's public license search. Choose the electrical license type, enter the number or business name, and confirm the license is active and the name matches the bid.

Does a contractor with a Texas license also need to register with Houston?

Yes. TDLR says a state license is valid anywhere in Texas, and Houston still requires every electrical contractor working in the city to register with its Electrical Inspections section.

Should the building owner buy the electrical permit?

No. Houston's code says only a licensed and registered electrical contractor may obtain an electrical permit, so the contractor buys it in its own name.

Ready to get it handled?

Flat-rate pricing quoted up front. Licensed and insured. A Wattsmith electrician calls you back within 15 minutes during business hours.

  • Licensed and Insured
  • BBB Accredited
  • Flat-Rate Pricing
  • Background-Checked
Call NowGet a Quote