Electrical Submetering for Apartments and Commercial Buildings

November 27, 2026Last updated 5 min readWattsmith Electric · TECL 41806

Key takeaways

  • A submeter measures one unit's or one tenant's use behind the utility's master meter.
  • For apartments, condominiums and mobile home parks, the Public Utility Commission of Texas rule 16 TAC 25.142 sets how submetered power is billed.
  • Under that rule, a tenant's bill is the average cost per kilowatt hour times the unit's use, with no extra charges beyond what the utility or retail provider bills the owner, apart from the narrow exceptions the rule allows.

Electrical submetering puts a meter on each unit or tenant behind the utility's master meter, so the owner can see and, where allowed, bill each one's use. It is common in apartments, condos and mobile home parks, and in offices and retail centers with several tenants. Our page for apartments, HOAs and property managers and our commercial electrical page cover the work.

What is electrical submetering?

The utility reads one master meter for the property. Submeters, owned by the property owner, measure each unit's or tenant's share. They are read by hand or, more often now, over a network. The owner or a billing company then bills each unit for its own use, or uses the data to manage energy across the property.

What does Texas law say about submetering apartments?

The Public Utility Commission of Texas rule 16 TAC 25.142 covers submetering for apartments, condominiums and mobile home parks. It defines an apartment house as one or more buildings with more than five dwelling units. Among its rules:

  • The lease must say the unit is submetered, and the tenant gets a copy of the rule or an approved summary when the lease is signed.
  • The owner divides the utility's or retail provider's net charges for the energy, plus tax, by the total kilowatt hours, and bills each unit that average cost times its own use.
  • The owner may not add charges beyond what the utility or retail provider billed, apart from the narrow exceptions the rule lists.
  • Common areas are the owner's cost, not the tenants'.
  • Submeters are read within three days of the utility's master meter reading, and the bill must say it is for submetered electricity.

The rule has much more, on records, disputes, disconnection and meter tests. Read the whole rule, with your attorney if needed, before you bill a tenant.

What are the submeter accuracy requirements?

The same rule requires submeters to be installed in line with the ANSI C12 standard and to meet its accuracy limits, and it lets a tenant ask for a test of their submeter. Records of each test are kept and shown to the tenant on request. Choosing a submeter that is certified to that standard is the place to start.

How does submetering work in an office or retail building?

The apartment rule does not cover commercial tenants. In an office or retail center, how submetered power is billed is set by the lease. Many owners also submeter to track energy by floor, by system or by tenant even when they do not bill for it.

How are submeters installed?

Each submeter is wired at the unit's panel or at a meter center, often with current transformers on the conductors it measures, and with a communication link back to the reading system. Panels have to have room for the meter equipment, and existing buildings sometimes need panel work first. The work follows the National Electrical Code and is done under a TDLR license. We install and wire the meters; billing is done by the owner or a billing company.

Should I inspect the electrical before adding submeters?

It is a good time to. Opening every unit's panel is a chance to catch loose connections, missing covers and overloaded circuits. Our post on a commercial electrical inspection covers what that check looks for.

What should I do next?

Send the number of units, the type of service, photos of the meter area and a typical unit panel, and how you plan to read and bill the meters. Book a site visit and you get a written price before any work starts.

Related help

Where to go from here

Ready to get it handled?

Flat-rate pricing quoted up front. Licensed and insured. A Wattsmith electrician calls you back within 15 minutes during business hours.

  • Licensed and Insured
  • BBB Accredited
  • Flat-Rate Pricing
  • Background-Checked
Call NowGet a Quote