Key takeaways
- A replacement rooftop unit's nameplate can call for a different circuit than the old one. Check it before the crane day.
- Each unit needs a disconnect within sight, and rooftop equipment needs a service receptacle nearby for the technician.
- Most commercial rooftop units are three phase, and the unit's voltage has to match the building's service.
Commercial HVAC electrical work is the part of a rooftop unit replacement nobody thinks about until the crane is on site. The new unit has to match the building's power, connect to a circuit sized for it, and have the disconnect and service outlet the code asks for. Getting it right is commercial electrical work that belongs in the plan from the start.
Will the existing circuit work for the new rooftop unit?
Maybe. Every unit's nameplate lists a minimum circuit ampacity, which sets the wire size, and a maximum overcurrent protection, which sets the largest breaker. A new, higher efficiency unit of the same tonnage often has different numbers than the one it replaces. The National Electrical Code sizes the circuit from those numbers, so we compare the new nameplate with the existing wire and breaker before the unit is ordered.
If the new unit needs less, the existing circuit may only need a smaller breaker. If it needs more, the wire may have to be replaced, which takes planning on a finished roof.
Where does the disconnect have to be?
Within sight of the unit, so the technician working on it can shut it off and see that it stays off. On a roof that is a weatherproof disconnect mounted on or beside the unit. Old disconnects are often rusted, sized for the old unit, or mounted where the new unit's access panels will be, so they are commonly replaced with the unit.
Does the roof need a service outlet?
Yes. The code asks for a receptacle near rooftop heating, air conditioning and refrigeration equipment, so technicians have power to work without running a cord up a ladder. It needs GFCI protection and a weatherproof cover. Many older roofs do not have one, and a replacement is the time to add it.
Does the voltage and phase have to match?
Yes. Most commercial rooftop units are three phase, at 208, 240 or 480 volts depending on the building. A unit ordered at the wrong voltage cannot be wired around. We confirm the building's service from the panel, not from the old unit's paperwork, before the order goes in.
Who does which part of the job?
The air conditioning contractor sets the unit, connects the ductwork, the refrigerant side and the controls. The electrician handles the circuit, the disconnect, the service receptacle and the power connection. We schedule around the crane so the power is ready the day the unit is set. Texas licenses electrical contractors through TDLR, and you can check a license on TDLR's electrician pages.
Does a rooftop unit replacement need an electrical permit?
New or changed circuits are permitted work in San Antonio, pulled by the licensed electrical contractor and inspected. The City's code amendments are in Chapter 10 of its city code. Our guide to how commercial electrical permits work in San Antonio walks through the steps.
What should I do next?
Send us the new unit's submittal sheet and a photo of the existing disconnect and nameplate. We will tell you what the electrical side needs and write the price before the work starts. For buildings with many units, our maintenance agreements cover the disconnects and connections on a schedule. If the building has a dock, our post on loading dock lighting covers that equipment too.