Key takeaways
- Start with the simple parts: the breaker, the sign's disconnect, the timer and the photocell.
- Inside the cabinet, the usual failures are LED power supplies, fluorescent ballasts and neon transformers.
- Texas licenses sign work separately through TDLR. An electrical contractor handles the circuit to the sign; work inside the sign is sign work.
Electric sign repair starts with one question: is the sign getting power? Many dark signs have nothing wrong with the sign at all. The circuit, the timer or the photocell has failed. For retail and shopping centers a dark sign costs customers every night, so it pays to know where to look. The circuit side is commercial electrical work.
Why did my business sign stop working?
- A tripped breaker, often after a storm or a fault in the sign.
- The sign's disconnect switch turned off, sometimes by a contractor who forgot it.
- A failed timer, or a timer reset to the wrong time after a power outage.
- A failed photocell, the sensor that turns the sign on at dusk.
- A failed power supply, ballast or transformer inside the sign cabinet.
If only part of the sign is dark, the circuit is usually fine and the failure is inside the sign: one power supply feeding one section, or one ballast feeding a pair of tubes.
What can I check myself?
Find the sign's breaker in the panel and see whether it is tripped. Look for the disconnect switch near or on the sign and make sure it is on. Check the timer for the right time and on and off settings. Cover the photocell at dusk, or in the day with tape, and see whether the sign comes on. Stop there; the inside of the sign is live equipment, often up a ladder.
What fails inside the sign?
Modern cabinet and channel letter signs use LED modules fed by power supplies, and the power supplies are the most common failure, especially in Texas heat. Older cabinet signs use fluorescent tubes and ballasts. Neon signs use high voltage transformers. Many older signs are converted to LED with retrofit kits, which cuts power use and service calls.
The National Electrical Code has its own article for signs. It asks for a disconnect within sight of the sign or one that can be locked off, and for retrofit kits to be listed for the purpose.
Who is licensed to repair an electric sign in Texas?
TDLR licenses sign work separately from general electrical work. Its electrician licensing pages list the Electrical Sign Contractor license for businesses and the sign electrician licenses for individuals. An electrical contractor handles the circuit that feeds the sign: the breaker, the wiring, the disconnect, the timer and the photocell. Work inside the sign itself is sign work. Ask whoever you call which license they hold.
Does a new sign need its own circuit?
The code asks commercial buildings and occupancies open to pedestrians to have a sign outlet, supplied by its own branch circuit, at each entrance the public uses. A tenant build-out is the time to make sure it is there and labeled. Our post on a commercial panel schedule explains why labeling it saves time on the next dark night.
How do I keep a sign from going dark again?
Put the sign on a timer with battery backup, or an astronomical timer that resets itself. Keep the photocell clean. Ask for the sign's power supplies to be checked on a schedule, and add surge protection where storms are common. Our maintenance agreements can cover the sign circuit with the rest of the building.
What should I do next?
Tell us what is dark and what is not, and send a photo of the sign and the panel. We check the circuit, the disconnect, the timer and the photocell, tell you if the problem is inside the sign, and write the price before the work starts. If the lot lighting is out too, our post on loading dock lighting covers exterior fixtures.