Skip to content
Wattsmith Electric

Commercial

Commercial LED Retrofit Payback in Houston: How the Figure Is Worked Out

November 1, 2026Last updated 6 min readWattsmith Electric · TECL 41806

Key takeaways

  • Payback starts with a fixture count and the wattage of each fixture type before and after, multiplied by real hours of use.
  • CenterPoint bills most commercial secondary service on Billing kVA, the 15 minute peak of the month, so lighting that runs at the peak lowers demand too.
  • Customers over 700 kVA are billed transmission on 4CP, and only primary service carries the 80% ratchet.
  • Your own figure comes from the free written estimate, built from your building's counts and bills.

LED retrofit payback is a calculation, and every input to it can be counted in your own building. A general figure from someone else's warehouse or office tells you little, because payback depends on how many fixtures you have, what they draw, how long they run and how CenterPoint Energy bills your account. This guide explains how the figure is worked out for a Houston commercial building, one input at a time, and which parts of your bill to read. It gives no number, because the only honest number is the one built from your counts.

What goes into an LED retrofit payback?

Payback compares what the retrofit costs installed with what it saves each year. The savings come from three places: less energy used by the new fixtures, a lower demand peak where lighting runs at the peak, and less maintenance. The installed price divided by the yearly savings gives the payback for that building.

  • The fixture count, by type and by area.
  • Wattage per fixture type, existing and proposed.
  • Hours of use per area, from schedules or controls.
  • How the account is billed for demand.
  • Lamp, ballast and lift costs the old system carries.
  • The installed price, from a written estimate.

Each input is something you can check. The counts can be walked again, the wattage read from fixture labels and specification sheets, the hours compared with your own schedules, and the billing structure read from the bill. A payback figure you cannot trace back to those inputs is a sales figure, not a calculation, and it deserves a second look.

How are fixture counts and wattage gathered?

A lighting audit walks the building and counts every fixture by type and location, then records what each type actually draws, including ballast or driver losses, not only the lamp rating. The proposed LED fixture for each type gets the same treatment, so the before and after wattage compare like for like.

Counts are usually kept by area because areas run on different hours. A warehouse floor, an office suite, a parking lot and a stairwell may all use different fixtures and different schedules. Keeping them separate also shows where controls such as occupancy sensors or daylight dimming change the hours, and where they would add little.

Why do hours of use matter so much?

Energy saved is the drop in wattage multiplied by the hours the fixtures run. The same fixture swap saves far more in an area lit around the clock than in one used a few hours a day. Real hours come from operating schedules, control settings, or a short logging period, not from an assumed number.

Exterior lighting and areas lit through every shift tend to carry the most hours, and storage rooms and conference rooms the fewest. A retrofit plan often starts with the high hour areas for that reason. Controls change hours rather than wattage, so they go into the same calculation as a second step after the fixture swap.

How does CenterPoint bill demand for a business?

Non-residential secondary service with a peak demand over 10 kVA is billed on CenterPoint's Secondary Service Greater Than 10 kVA schedule. Its distribution charge is per Billing kVA, and Billing kVA is the NCP kVA, the kVA supplied during the 15 minute period of maximum use in the billing month.

That structure matters for lighting. If the lights are on during the building's busiest 15 minutes of the month, every watt removed from them also lowers that peak, and so lowers the Billing kVA. If the peak happens when the lights are off, the retrofit saves energy but moves the demand line little. Your interval data shows which case your building is.

Because billing is in kVA rather than kW, the power factor of the new fixtures also counts. LED drivers differ in power factor, and a driver with a poor one draws more kVA for the same light. The fixture specification sheet lists it, and it belongs in the comparison alongside wattage.

The schedule language is in CenterPoint's Tariff for Retail Delivery Service. We describe its structure only; the charge amounts are on the tariff itself.

What changes for customers over 700 kVA?

Customers who have set an NCP demand over 700 kVA in any previous billing month are billed IDR metered charges, and their transmission is figured on 4CP: the average of their 15 minute demand at ERCOT's monthly system peaks in June, July, August and September of the previous calendar year.

For a large building, that means lighting that runs during summer afternoon peaks affects the next year's transmission billing as well as the current month's demand. A retrofit that lowers load at those moments carries into the 4CP figure. Whether your account is on this schedule shows on the bill and in your interval data.

When does a demand ratchet enter the math?

Only on primary service. CenterPoint's primary schedule, for customers served directly from feeder lines of at least 12,470 volts but under 60,000, sets Billing kVA at the higher of the month's peak or 80% of the highest peak in the prior 11 months. The secondary over 10 kVA schedule has no ratchet text.

For a primary customer, a lower peak after a retrofit may take time to show fully on the distribution line, because an earlier high month can still set the billing figure. That timing goes into the payback for those accounts. Most commercial buildings on secondary service do not carry it, so check which schedule applies before you model it.

How does maintenance count in the payback?

Older fluorescent and metal halide systems need lamps and ballasts replaced on a cycle, often with a lift and a crew in high ceilings. LED fixtures with rated life well beyond those lamps remove most of that work. The yearly cost of the old cycle, from your own maintenance records, goes into the savings side.

Your records are the right source for this input, not a general allowance: how many lamps and ballasts were bought, how often a lift was rented, and how many hours of labor went to relamping. Where records are thin, the audit can count failed lamps and note fixture age to help estimate the cycle.

Which lines on the bill should you read?

CenterPoint's delivery charges reach you through your retail electric provider, which the tariff calls the Competitive Retailer, so your bill shows both energy and delivery items. Look for the energy used in kWh, the demand in kVA or kW, and, for large accounts, any 4CP or transmission line.

Twelve months of bills, or better, the interval data behind them, show when the peak happens and how steady it is. Bring them to the estimate. With those, the counts from the audit and the installed price, the payback figure stops being an estimate of an estimate and becomes a calculation you can check.

How do you get a payback figure for your building?

Ask for a free written estimate built from your building. We count the fixtures, record the wattage and hours by area, review twelve months of bills for how demand is billed, and price the retrofit. The written estimate shows each input, so you can see how the figure was reached.

See our Houston LED lighting retrofits, the Houston commercial electrician hub and our commercial electrical services. The same demand rules shape commercial EV charger installation in Houston, and our post on CenterPoint demand charges and LED retrofits covers the bill in more depth.

FAQ

Common questions

Straight answers. If you do not see yours, call us and ask.

Does an LED retrofit lower my CenterPoint demand charge?

It can, if the lighting is on during your building's 15 minute peak of the month. Billing kVA is set by that peak, so lighting load removed at that time lowers it.

Does the 80% ratchet apply to my building?

Only if you are on CenterPoint's primary service schedule. The secondary service over 10 kVA schedule carries no ratchet text.

Can you give me a payback figure before visiting?

No. The figure depends on your fixture counts, wattage, hours and how your account is billed, so it comes from the free written estimate.

Related help

Where to go from here

Ready to get it handled?

Flat-rate pricing quoted up front. Licensed and insured. A Wattsmith electrician calls you back within 15 minutes during business hours.

  • Licensed and Insured
  • BBB Accredited
  • Flat-Rate Pricing
  • Background-Checked
Call NowGet a Quote