Key takeaways
- Every washer and dryer gets a circuit sized to its nameplate, and the machines' total sets the service size.
- Many laundromats run on three phase power, and the machine voltages have to match what the building has.
- Opening a laundromat in a space built for something else often means a new service, coordinated with CPS Energy, and a change of occupancy review.
Laundromat electrical work is mostly a question of load. Every machine in a coin laundry can run at the same moment on a busy morning, so the circuits, the panels and the service all have to be sized for the whole wall at once. Whether you are opening a new store or adding machines to one you run, it is commercial electrical work from the start.
What does each machine need?
Each washer and dryer has a nameplate listing its voltage, phase and current, and the manufacturer's install manual says what circuit to give it. Front load washers and gas dryers need less than many owners expect. Electric dryers need far more. Stacked units, card readers, change machines, vending, water heaters and lighting all add to the total.
Each machine usually gets its own circuit so one fault does not take down a row. The National Electrical Code sets how motor and appliance circuits are sized and protected from those nameplate numbers.
Does a laundromat need three phase power?
Often, yes. Large commercial washers and dryers are commonly built for three phase power, which runs motors more efficiently and spreads a big load evenly. The catch is matching: the machines have to be ordered in the voltage and phase the building has, or the building's service has to change. We check that before the machines are ordered, not when they arrive on a truck.
Our guide to three phase service and commercial panel upgrades explains the service side.
Will the building's service be big enough?
In a space that used to be a store or an office, often not. A full laundromat can need a much larger service than retail. That means a new service from the utility, which in most of San Antonio is CPS Energy. Our post on CPS Energy new commercial service walks through their process and the lead time it adds.
Is opening a laundromat a change of occupancy?
It can be, when the space was used for something else. A change of use can bring code reviews of the whole space, not just the new work. Our guide to change of occupancy and the electrical code in San Antonio covers what that review looks at.
What about the wet areas and the water heater?
A laundromat has water everywhere. Receptacles near sinks and in wet areas need GFCI protection under the code, and the floor drains and folding tables shape where outlets go. A large commercial water heater, electric or gas, is its own load or its own gas line, and it has to be on the plan from the first day.
How do I keep a laundromat running?
- Label every machine's breaker, so a tripped circuit is found in seconds, not by trial and error.
- Keep the panels clear of carts, detergent boxes and lint. Lint and heat do not mix.
- Have the panels and connections checked on a schedule; a thermal scan finds a hot connection before it fails.
- Add surge protection for the card readers and machine boards.
Our maintenance agreements page covers scheduled checks, and our post on a commercial panel schedule explains why a good directory saves time on every call. Send us the machine list and the space, and we will write the price before the work starts.