Key takeaways
- A general home inspector's electrical section is a visual screening, not an evaluation by a licensed electrician.
- A home electrical inspection by a licensed electrician opens the panel, tests devices and prices each finding.
- Schedule the electrical inspection early in the option period so you have a written price before your deadline.
- Wattsmith issues a written report signed by a Texas licensed master electrician, with a flat price for every repair it lists.
- Panel brand, aluminum branch wiring and grounding are the findings that move the numbers most in older San Antonio homes.
You are under contract on a house in San Antonio, the option period is running, and the inspection report has an electrical section full of items you cannot price. A home electrical inspection by a licensed electrician turns those items into a written list of what is wrong, what it costs to fix, and which findings actually matter, while you still have the right to walk away or renegotiate.
This guide is for buyers. It explains what the general inspector looked at, what a licensed electrician looks at that the general inspector does not, how the written report works, and how to time and use it inside a Texas option period. If you are selling instead, the same inspection run before listing works in your favor, and we cover that separately.
Why the general home inspection is not an electrical safety inspection
Texas home inspectors are licensed by the Texas Real Estate Commission and report on the TREC inspection report, the standard form every licensed inspector in the state uses. Its electrical section covers the service entrance and panels, then branch circuits with their connected devices and fixtures. Each item is marked inspected, not inspected, not present or deficient, with comments.
That form is a screening. A good inspector removes the panel cover where it is safe to do so, looks for obvious problems, tests a sample of receptacles and notes what is visibly wrong. The inspector is not an electrician, does not repair anything and does not price anything. Many reports close the electrical section with a recommendation to have a licensed electrician evaluate further. That sentence is the inspector telling you the screening found something worth a closer look.
An electrical safety inspection by a licensed electrician is a different kind of visit. The electrician is licensed by the Texas Department of Licensing and Regulation, works on these systems every day and can tell you not only that something is wrong but why, how serious it is and what the repair involves. That last part is the piece buyers need, because a deficient mark with no price attached gives you nothing to negotiate with.
If you want to see the items general inspectors flag most often in this area before you read your own report, our guide to home inspection electrical items in San Antonio walks through them one by one.
What a licensed electrician checks in a home electrical inspection
Our home electrical inspection follows the path power takes into the house and out to the rooms. The order matters, because a problem at the service affects everything downstream of it.
- Service entrance and meter base: the CPS Energy service drop or underground lateral, the mast and weatherhead where present, the meter base condition and signs of heat or water entry.
- The main panel: brand and model, age, bus condition, breaker fit, signs of overheating or arcing, and whether the panel is listed for the breakers installed in it.
- Federal Pacific Stab-Lok and Zinsco equipment: both brands carry documented concerns about breakers that may not trip and bus connections that may fail, and both are reasons insurers ask questions.
- Double taps: two conductors under a breaker terminal made for one, one of the most common panel findings in the area.
- Grounding and bonding: the grounding electrode conductor, the connection to the water line and gas piping where required, and the neutral to ground bond in the right place and only there.
- Branch circuit wiring type: copper, aluminum, cloth-sheathed or knob and tube, and the condition at the devices.
- Aluminum branch circuits: common in homes wired roughly from the mid 1960s to the mid 1970s, checked at receptacles and switches for heat damage and the right connection methods.
- GFCI and AFCI protection: tested where it exists, noted where it is missing in kitchens, baths, garages, outdoors and laundry areas.
- Receptacle testing: polarity, open grounds and loose devices across the house, not a sample.
- Overheating: discoloration, melted insulation and warm breakers, with a thermal camera where a hot spot is suspected.
We also note what was not accessible, such as a panel blocked by built-in shelving or an attic too tight to walk, so you know the limits of what the report covers.
For a buyer before closing, this is the Real estate electrical inspection task, from $563. The price is set in our published book, confirmed before we start, and it includes the written report. Starting price. Your tech confirms the final number on site before any work.
Call us with the address and your option period deadline, and we will tell you on the phone which visit fits. You can also book the inspection online and attach the general inspector's report so the electrician reads it before arriving.
The written report and who signs it
Every Wattsmith inspection ends in a written report signed by a Texas licensed master electrician. It lists each finding in plain language with photos, states whether the item is a safety concern or a maintenance item, and gives a flat price for the repair from our published price book. Wattsmith Electric is licensed by TDLR under TECL 41806, and the license number is on the report.
That combination matters in a negotiation. A seller or the seller's agent can argue with a general inspector's comment. A signed report from a licensed electrical contractor, with a specific repair and a specific price, is much harder to wave off, and it gives both sides a number to work from.
If you only need the full safety picture without a sale attached, for example on a house you already own, we also run a broader whole-home inspection that tests every circuit and device in detail.
That deeper visit is the Whole-home electrical safety inspection task, from $563. Most buyers under contract choose the pre-sale inspection because it is built around the option period and the repair amendment. Starting price. Your tech confirms the final number on site before any work.
Timing the electrical inspection before buying a house
The Texas resale contract gives the buyer an option period: a negotiated number of days, paid for with the option fee, during which you can end the contract for any reason. Everything you want to learn about the house needs to happen inside that window, and so does the negotiation that follows.
The best order is simple. Schedule the general inspection first, read the electrical section the day you get the report, and call an electrician the same day if anything is marked deficient. Waiting until the last two days of the option period is the most common mistake we see, because it leaves no time to get a price, discuss it with your agent and get an amendment signed.
- Day of the general inspection report: send us the electrical section and the address.
- Next available visit: the electrician inspects, photographs and prices.
- Within a day of the visit: you receive the signed written report.
- Remaining option days: you and your agent decide what to ask for and send the amendment.
We cannot promise a date before we know the schedule, so call to schedule and tell us your deadline. When the option period is tight, say so on the first call and we will tell you plainly whether we can fit it.
If you are the agent, send this page to your buyer with the inspection report attached. You can also contact us directly and we will coordinate access with the listing agent.
Findings that change the numbers in San Antonio homes
Most electrical findings are inexpensive: a missing GFCI, a loose receptacle, a cover plate. A few change the size of the conversation, and they are the ones to understand before you decide what to ask for.
A Federal Pacific or Zinsco panel usually means replacement, not repair. Our guide to Federal Pacific and Zinsco panels in San Antonio covers why, and why insurers often ask about them.
Aluminum branch wiring is manageable when the connections are corrected with listed methods, and expensive when the house is rewired. Read aluminum wiring in San Antonio homes before you assume the worst.
Grounding problems range from a missing bond at the water line, which is quick, to a house with no equipment grounding conductors at all, which is a larger project. Open grounds at three-prong receptacles are common in older neighborhoods and are usually correctable one circuit at a time. Double taps are routine panel corrections. Signs of overheating at the panel or the meter base move to the top of the list regardless of cost, because they are where fires start.
The service entrance gets its own look because it is shared ground between you and CPS Energy. Our guide to the meter loop, mast and weatherhead explains which parts belong to the homeowner and which belong to the utility.
Using home electrical inspection findings to negotiate
Once you have the signed report, you and your agent have three common choices for each item: ask the seller to make the repair before closing, ask for a lower price, or ask for a credit at closing. Each has tradeoffs, and the right one depends on the item.
- Small safety items such as GFCI protection and double taps are often easiest to have the seller repair, with the invoice provided at closing.
- Panel replacement and aluminum remediation are larger, and many buyers prefer a credit or price reduction so they choose the contractor and see the work done.
- Anything marked as active overheating should be addressed before you move in, whoever pays for it.
We cover the credit question in detail in seller credit for electrical repairs, and the repair side in electrical repairs after a home inspection.
Whatever you ask for, the flat price on our report is the anchor. It is the same price we would charge you to do the work after closing, from the same published book, so the number you negotiate with is a number you can actually buy the repair for.
Electrical inspection near me: the San Antonio area we cover
We inspect across San Antonio and the surrounding cities, from older housing stock in Alamo Heights to newer subdivisions in Alamo Ranch. The full list is on our service areas page. The age of the house matters more than the zip code: a 1960s ranch in any part of town tends to show the same findings.
Foundation and structural questions go to an engineer
San Antonio clay soils move, and many buyers who order an electrical inspection also have a foundation question in the same report. Those are separate disciplines. Wattsmith is an electrical contractor and does not evaluate foundations or structure.
For that part of the house, our sister firm, 254 Engineering (Texas Board of Professional Engineers and Land Surveyors firm F-29811), handles foundation and structural evaluations. Buyers who need both can schedule them in the same option period, and we will coordinate visit times when the house is vacant.
What happens after closing
If the repairs become yours, the report you paid for during the option period becomes the scope of work. You approve the flat price before work starts, we pull the permit where the work requires one through the San Antonio Development Services Department or the city that has jurisdiction, and we schedule the inspection. Panel work that requires the service to be disconnected is coordinated with CPS Energy.
Our electrical inspection service page lists what each inspection includes, and our pricing page explains how the flat-rate book works. When you are ready, book the inspection and tell us your option period deadline on the first call.