Key takeaways
- Start with a few Level 2 chargers and the conduit for more, rather than every space at once.
- Load management lets many chargers share a limited service, and the code allows the feeder to be sized to the managed load.
- The service is usually the deciding factor. If it must grow, CPS Energy's process sets the timeline.
EV charging for apartments has moved from a perk to a question prospective residents ask on tour. For owners, the electrical side decides most of the cost and the timeline. This guide covers how to plan it, from the first few EV charger installations to a property wired for many more. It is commercial electrical work, planned around the property's service.
How many chargers should an apartment complex start with?
Fewer than you might think, with room to grow. A handful of Level 2 chargers in a shared area, used on a schedule or billed by the session, serves early demand. Running empty conduit to more spaces while the parking lot is open costs far less than trenching again later. Watch the usage for a year, then add.
Level 2 or DC fast charging?
For residents who park overnight, Level 2 is almost always the right answer. A car parked for eight hours on Level 2 is full by morning. DC fast chargers need a much larger service and cost far more to install, and they make more sense along highways and at retail than in a residential lot.
What is load management, and why does it matter?
Load management shares a fixed amount of power among many chargers, slowing each one when many are in use. That lets a property add more chargers than its spare capacity could carry at full speed. The National Electrical Code allows chargers on an energy management system to be counted at the managed load when sizing the feeder and service, which can be the difference between a panel upgrade and none.
Will the property's service be big enough?
That is the deciding question. Older complexes often have little spare capacity once every unit runs its air conditioning in August. A load study answers it. If the service has to grow, CPS Energy is involved, and our guide to CPS Energy new commercial service explains their process and the lead time it adds.
Where should the chargers go?
- Close to the electrical room or a transformer, to keep runs short.
- Where the parking lot will not be torn up again soon, or where conduit can go in during a repaving.
- In a well lit area residents feel safe in at night.
- Protected from cars by curbs, wheel stops or bollards.
What else should owners plan for?
Who pays for the electricity, and how: networked chargers can bill residents directly by the session. Who maintains the chargers. Whether the common area panels have room. Our guide to multifamily common area electrical covers those panels, and a commercial panel schedule keeps the new circuits easy to find.
Does EV charging need a permit in San Antonio?
Yes. New circuits and feeders are permitted work, pulled by the licensed electrical contractor and inspected. Our guide to how commercial electrical permits work in San Antonio walks through it. Send us the site plan and the panel labels, and we will write the price before the work starts. If the property also has a warehouse or a fleet, our post on a forklift charging station covers another charging load.