Key takeaways
- Most breakers have to be pushed fully to OFF before they will latch back ON. That one step fixes many breakers that seem stuck.
- A breaker that trips the instant it is reset is usually reporting a short or a ground fault on the circuit, not a bad breaker.
- Do not hold a breaker on or reset it again and again. Unplug the circuit's loads, try once, and call if it will not hold.
When a breaker won't reset, half the house can be dark, the refrigerator warm and the reason unclear. Sometimes the fix takes ten seconds. Sometimes the breaker is protecting you from a fault in the wiring, and the right move is to stop and book electrical repair. This guide covers how to tell the two apart.
How do I reset a tripped breaker the right way?
A tripped breaker usually sits in the middle, between ON and OFF, or shows a colored flag. Push the handle firmly all the way to OFF first. You should feel it click. Then push it to ON. Many breakers will not latch if you go straight from the middle position to ON, which is why a breaker can seem stuck when it is not.
If the breaker is an AFCI or GFCI breaker, it has a test button and may show which kind of fault tripped it. Reset it the same way.
Why does the breaker trip again as soon as I turn it on?
- A short circuit: a hot wire touching a neutral or another hot wire, in a device, a fixture, a cord or the wiring itself.
- A ground fault: a hot wire touching a grounded box, a pipe or a wet surface.
- An appliance with an internal fault that is still plugged in or hard wired.
- An arc fault, which an AFCI breaker is built to detect, such as a damaged cord or a loose connection.
An instant trip is the breaker doing its job. Unplug everything on the circuit and switch off its lights, then try once more. If it now holds, plug things back in one at a time; the one that trips it is the problem. If it trips with nothing connected, the fault is in the wiring or a device in the wall.
Can a breaker itself go bad?
Yes. A breaker that will not latch at all, feels loose, is hot to the touch, smells burnt or shows scorching has likely failed, and so may the connection behind it. A replacement has to be a breaker listed for that panel; the National Electrical Code requires equipment to be installed according to its listing. Our circuit breaker replacement page covers that work.
Is it safe to keep resetting it?
No. Each trip on a short or ground fault is a burst of current through the fault. Resetting over and over can damage the wiring, the device at fault and the breaker. Never tape, hold or wedge a breaker on, and never swap in a larger breaker to stop the trips. The breaker is sized for the wire, not the load.
Who can work inside the panel in Texas?
Work inside the panel and on the wiring is electrical work, and in Texas electricians are licensed by TDLR. Resetting a breaker is something any homeowner can do. Opening the panel cover is not the same thing, because the parts behind it stay live even with the main breaker off.
What should I do next?
Write down which breaker it is, what was running when it tripped, and whether it holds with everything unplugged. Book an electrical repair visit and we find the fault and give you a written price before any work starts. If the breaker that will not reset feeds a pool, our post on a pool pump not turning on is next.