Skip to content
Wattsmith Electric

Troubleshooting

Space Heater Keeps Tripping the Breaker? Here Is Why

November 24, 2026Last updated 4 min readWattsmith Electric · TECL 41806

Key takeaways

  • A typical space heater on high uses most of what a standard 15 amp bedroom circuit can carry for hours at a time.
  • Add a lamp, a TV or a second heater on the same circuit and the breaker trips, which is it doing its job.
  • Never fix it with an extension cord, a power strip or a bigger breaker. The fix is moving the load or adding a circuit.

If your space heater keeps tripping the breaker, the breaker is almost certainly working. A space heater is one of the largest loads most people ever plug into an ordinary outlet. When a cold room needs heat every winter, the lasting fix is often a dedicated circuit. This guide explains why.

Why does a space heater trip the breaker?

Most portable heaters draw about 1,500 watts on high. At 120 volts that is around 12.5 amps. A standard bedroom or living room circuit is protected by a 15 amp breaker, and that circuit usually feeds several outlets and often the lights in more than one room.

So the heater alone uses most of the circuit. Turn on a hair dryer, a vacuum or a second heater anywhere on the same circuit, and the total goes past what the breaker allows. It trips to keep the wire in the wall from overheating.

Why does it trip after a while, not right away?

Breakers respond to heat as well as to sudden overloads. A load slightly over the limit can run for many minutes before the breaker's thermal element trips it. A heater also runs for hours, and the National Electrical Code treats a load that runs three hours or more as continuous, sizing circuits so a continuous load uses no more than 80 percent of the breaker's rating. On a 15 amp circuit that is 12 amps, just under what a heater on high draws.

Is it safe to use an extension cord or power strip?

No. Most extension cords and power strips are not rated for a heater's load for hours. They heat up at the plug and along the cord, and that heat is a fire risk the breaker cannot see, because the breaker protects the wire in the wall, not the cord on the floor. Plug the heater straight into a wall outlet, and keep it clear of bedding, curtains and furniture.

Can I just put in a bigger breaker?

Never. The breaker is sized to the wire in the wall. A 20 amp breaker on wire meant for 15 amps lets that wire run hot without ever tripping, which is how house fires start. A breaker that trips is the warning, not the problem.

What if the outlet or plug gets hot?

Stop using it. A plug or outlet that is warm with a heater running usually means worn contacts or a loose connection, and heat at a connection gets worse with time. Our guide to a hot or sparking outlet explains what to do.

How do I heat a cold room for good?

  • Move the heater to an outlet on a circuit with little else on it, if you can find one.
  • Have a dedicated circuit run for the heater, or for a permanent wall heater.
  • Look at why the room is cold: insulation, a duct problem, or a room the central system never reached.
  • For an addition or garage room, a mini split heats and cools on its own circuit.

Adding a circuit is permitted work inside San Antonio, pulled by the licensed electrical contractor on the City's electrical permit application. If the breaker trips every time it rains instead of every time it is cold, read our post on a breaker that trips when it rains. Book a dedicated circuit installation visit and you get a written price before the work starts.

Related help

Where to go from here

Ready to get it handled?

Flat-rate pricing quoted up front. Licensed and insured. A Wattsmith electrician calls you back within 15 minutes during business hours.

  • Licensed and Insured
  • BBB Accredited
  • Flat-Rate Pricing
  • Background-Checked
Call NowGet a Quote