School electrical contractor for San Antonio schools and daycares

Classroom power and technology, lab and kitchen circuits, emergency lighting that passes inspection, and work scheduled for summers, breaks and after the last bus, with children's safety first on every site.

  • Licensed and Insured
  • BBB Accredited
  • Veteran Owned
  • TECL 41806

Tell us what is going on

Tap what you need, tell us when, and a real electrician calls you back.

Step 1 of 2

What do you need?
When works for you?

Sparks, burning smell, or a dead panel? Call (210) 446-5446 now instead of waiting on a callback.

We only use your number to call you back about this job.

By continuing, you agree that Wattsmith may call or text you back about your request.

You approve one flat price before any work starts. No hourly meter, no surprise invoice.

We hit your window. Miss it with no heads-up, and that is $149 off. The fine print

A Wattsmith electrician calls you back within 15 minutes during business hours.

What the work involves

When can electrical work be done at a school or daycare?

Larger school and daycare electrical work is scheduled for summer and long breaks, and smaller work after dismissal. We order long lead items as soon as the scope is approved, so a summer project does not run into the first week of school. Where children are present, work areas are closed off.

Classrooms and technology

Classrooms now carry projectors, charging carts and devices on every desk, and older buildings were not wired for them. We add circuits where the load has grown, and plan receptacle locations with the school so cords are not run across the floor.

Labs, shops and kitchens

Science labs, career shops and cafeteria kitchens each have their own equipment circuits and the GFCI protection NEC 210.8(B) requires in the locations it lists. Shop equipment gets disconnects where the code calls for them.

Emergency lighting and exit signs

Hallways and stairs must stay lit when the power fails. NFPA 101 sets a monthly 30 second test and an annual 90 minute test for battery units, with written records, and we keep those records ready for the fire marshal.

Working around the school year

Larger work is scheduled for summer and long breaks, and smaller work after dismissal. On a site with children present, our work areas are closed off and no open panel or tool is left unattended.

Public school districts

Public districts usually buy through bids, approved vendor lists and cooperative contracts. We bid in writing to the district's scope and pull the permit where the work needs one.

What goes wrong, and how we prevent it

Summer projects go wrong when parts arrive late and the work runs into the first week of school. We order long lead items as soon as the scope is approved, and plan the work so each room is finished and safe before the next is opened.

Questions about school and daycare electrical work? Call or get a quote.

Commercial quote

When can the work at your school be done?

Describe the building, the work and when it can be done. The owner responds the same business day.

Prefer to talk? Call (210) 446-5446.

Step 1 of 2

What do you need?
When works for you?

Sparks, burning smell, or a dead panel? Call (210) 446-5446 now instead of waiting on a callback.

We only use your number to call you back about this job.

By continuing, you agree that Wattsmith may call or text you back about your request.

You approve one flat price before any work starts. No hourly meter, no surprise invoice.

We hit your window. Miss it with no heads-up, and that is $149 off. The fine print

A Wattsmith electrician calls you back within 15 minutes during business hours.

FAQ

What do school administrators ask about electrical work?

Straight answers. If you do not see yours, call us and ask.

Yes. Larger work is scheduled for summer and long breaks, with long lead parts ordered as soon as the scope is approved.