LED retrofits and controls
Garage fixtures run long hours, so a retrofit to LED cuts both the energy and the lamp changes. Controls dim fixtures in empty areas and bring them up when someone walks or drives in, and daylight sensors near open sides turn down fixtures the sun already covers.
- Fixture by fixture LED retrofits
- Occupancy dimming and daylight sensors
- Fixtures rated for the damp garage environment