Start from the equipment sheets
Each machine's sheets give its voltage, phase, full load current, the circuit size, the connection and whether it needs a dedicated disconnect. We read them before anything is ordered, and flag anything the building cannot supply as it stands.
- Voltage, phase and current from the sheets
- Circuit and disconnect sizing
- Gaps in the building's supply flagged early