Key takeaways
- Check the simple things first: the breaker, the pump's own disconnect, and whether the pressure switch has power.
- A well pump breaker that keeps tripping points to a fault in the pump, its cable or a splice, not to a tired breaker.
- The electrician covers the circuit, the pressure switch and the control box; work on the pump in the well is a licensed pump installer's job in Texas.
A well pump not working means no water, and on a rural lot around San Antonio that is an emergency. Many causes are electrical, and several can be checked in a few minutes. This guide walks through them in order, and explains which parts are electrical repair and which belong to the pump installer.
What should I check first when the well pump stops?
- The breaker for the pump in the main panel. Most home well pumps run on a 240 volt double breaker.
- Any disconnect switch near the pressure tank or at the well.
- The pressure gauge on the tank: if it reads near zero and the pump is not running, the pump is not getting a start signal or not getting power.
- Whether the power has just come back from an outage or a storm, which can trip a breaker or damage the pressure switch.
If the breaker is tripped, reset it once. If it trips again, leave it off and call. Resetting it over and over can turn a repair into a replacement.
Why does my well pump keep tripping the breaker?
A breaker that trips when the pump tries to start is doing its job. The usual causes are a short in the pump motor, damaged cable down the well, water getting into a splice, or a failing start part in the control box. Lightning is a common culprit in the Hill Country, because the pump sits at the bottom of a long metal path into wet ground.
The fix is to find the fault with a meter, not to put in a larger breaker. The breaker is sized to the pump and its wire, and the National Electrical Code sets that sizing so the wire never carries more than it safely can.
What does the pressure switch do?
The pressure switch tells the pump when to run. When the tank pressure drops to the low setting, its contacts close and send power to the pump; when it reaches the high setting, they open. Over years the contacts pit and burn, and a switch that clicks but sends no power, or chatters, is a common reason the pump will not start. Ants nesting in the switch are a known Texas problem too.
What is the control box, and does every pump have one?
Many submersible pumps, called three wire pumps, have a control box on the wall near the tank that holds the start capacitor and relay. When a capacitor fails, the pump hums but will not start, and the breaker may trip. Two wire pumps have those parts built into the motor down the well, so there is no box to check.
Who fixes which part?
An electrician covers the circuit from the panel, the disconnect, the pressure switch wiring and the control box. Pulling the pump, replacing the drop cable or setting a new pump is a pump installer's job. TDLR regulates private water well drilling and pump installation in Texas, and you can check an electrician's license on TDLR's electrician pages.
Should my well pump be on the generator?
If you lose water every time you lose power, yes. A standby generator sized for the pump's starting load keeps water running in an outage. The pump's start is the biggest single surge in many rural homes, and the generator has to be sized for it. If the pump starting also dims the lights, our post on lights that flicker when the AC turns on explains the same effect.
What should I do next?
Turn the pump's breaker off if it keeps tripping, and call. We test the circuit, the pressure switch and the control box, tell you whether the fault is above ground or down the well, and write the price before the work starts. Book through electrical repair.