Key takeaways
- A brief, slight dim when the compressor starts is normal: a motor draws far more current for a split second as it starts.
- A deep dim, a flicker that lasts, or one that is getting worse points to a loose connection, a weak service or a failing part on the unit.
- If lights flicker all over the house or the neighbors see it too, the utility's side of the service may be the cause.
If your lights flicker when the AC turns on, you are in good company. In a San Antonio summer the air conditioner starts dozens of times a day, and many homes show a small dip in the lights each time. Sometimes that is just physics. Sometimes it is the first sign of a connection that needs electrical repair. This guide covers how to tell.
Why do the lights dim when the air conditioner starts?
An air conditioner's compressor is a large motor, and a motor draws several times its running current for the fraction of a second it takes to get up to speed. That surge pulls the voltage in the house down for a moment, and incandescent and some LED bulbs show it as a blink. Once the compressor is running, the draw drops and the lights recover.
A quick, shallow dip that is over before you can say "there it is" is generally normal. It is most noticeable on lights that share a circuit or a panel bus with the air handler.
When is the flicker a problem?
- The lights dim deeply, or stay dim for a second or more.
- The flicker is getting worse over weeks, or started suddenly.
- Lights brighten as well as dim, or other appliances act up at the same moment.
- You smell something hot at the panel, or the panel or meter base buzzes.
- The air conditioner hums, struggles to start, or trips its breaker.
Any of these is worth a visit. Lights that get brighter as well as dimmer are the most urgent, because they can mean a loose neutral connection, which can send high voltage to some circuits and damage electronics.
What causes a bad flicker?
The usual causes are a loose or corroded connection at the panel, the meter base or the air conditioner's own disconnect; a service that is too small for the load the house now runs; or a failing start capacitor on the outdoor unit that makes the compressor struggle each time. The National Electrical Code sets how those connections are made and how the service is sized, and an electrician checks each against it.
Is it the air conditioner or the electrical?
Sometimes both. A weak capacitor or a compressor that is wearing out draws more current on every start, and that is an air conditioning repair. A loose connection or an undersized service is electrical. A good first visit measures the voltage drop at start and looks at the connections, so you know which trade to call.
What if the whole neighborhood flickers?
If the lights flicker throughout the house even when the air conditioner is off, or neighbors see the same thing, the problem may be on the utility side: the transformer or the service wires to the house. In most of San Antonio that is CPS Energy, the city-owned utility, and they are the ones to call for their equipment.
Can a bigger panel fix it?
If the cause is a service that is simply too small for today's air conditioning, a panel upgrade with a larger service is the real fix. If the cause is a loose connection, a new panel is not needed; tightening or replacing the failed part is. Our guide to flickering lights covers flicker that has nothing to do with the air conditioner.
What should I do next?
Note when it happens and how deep the dim is, and whether lights ever brighten. Book an electrical repair visit and you get a written price before any work starts. If winter brings the opposite problem, our post on a space heater that keeps tripping the breaker is next.