Key takeaways
- A mini split needs its own circuit, sized from the numbers on the outdoor unit's nameplate, not from a guess.
- The code asks for a disconnect within sight of the outdoor unit, so it can be shut off where it is worked on.
- The air conditioning contractor sets the units and the line set; the electrician runs the circuit, the disconnect and the permit for that work.
Mini split electrical requirements come down to three things: a dedicated circuit sized from the unit's nameplate, a disconnect near the outdoor unit, and room in the panel for both. Ductless mini splits are a popular fix for a garage, an addition or a back bedroom the central air never reaches. The indoor head looks simple. The wiring behind it is where installs go wrong.
Does a mini split need its own circuit?
Yes. A mini split is a motor and compressor load, and it gets a circuit of its own. Most home units run at 240 volts, and a few small ones run at 120. Sharing a circuit with outlets or lights invites nuisance trips when the compressor starts, and it is not how the equipment is listed to be installed.
A multi zone system, with one outdoor unit feeding two or more indoor heads, usually still needs one circuit to the outdoor unit, which then feeds the heads through its own interconnect wiring. Two separate single zone systems need two circuits.
How is the circuit sized?
From the nameplate on the outdoor unit. It lists a minimum circuit ampacity, which sets the wire size, and a maximum overcurrent protection, which sets the largest breaker allowed. The National Electrical Code has its own article for air conditioning equipment, and it leans on those two numbers rather than on the unit's tonnage or a rule of thumb.
That is why the same size system from two makers can need different breakers. We read the plate on the unit you are buying before we pull wire, not the brochure.
Where does the disconnect go?
The code asks for a disconnecting means within sight of the outdoor unit, so whoever services it can shut it off where they stand and see that it stays off. In practice that is a small weatherproof disconnect box on the wall beside the condenser. It is a common miss on installs done without an electrician, and inspectors look for it.
Will my panel have room for a mini split?
Often, but not always. A 240 volt circuit takes two spaces in the panel, and the load has to fit within what the service can carry alongside everything else in the house. A home that already runs central air, an electric dryer and an EV charger may be closer to full than it looks. If the panel is out of space or capacity, the options are a subpanel, a panel upgrade, or picking a smaller unit.
Who does which part of the install?
Two trades share the job. The air conditioning contractor sets the indoor and outdoor units, runs and charges the refrigerant line set, and handles the condensate drain. The electrician runs the circuit from the panel, sets the disconnect and makes the electrical connection at the outdoor unit. Texas licenses both trades through TDLR, and each is responsible for its own side.
When we do the electrical side, we schedule around the air conditioning contractor so the circuit is ready when the units are set. You can check any electrical license on TDLR's electrician pages.
Does a mini split circuit need a permit in San Antonio?
A new circuit is permitted work inside the city. The licensed electrical contractor pulls it on the City's electrical permit application, and the City adopts the code with its own amendments in Chapter 10 of its city code. Texas adopted the 2026 NEC effective September 1, 2026, as TDLR announced. Cities around San Antonio run their own permit offices, so outside the city limits the first step is confirming what that city asks.
What should I do next?
Send us the model number of the unit you are considering, or the nameplate photo if it is already bought. We check the panel and the run to the outdoor unit and write the price before the work starts. If the same house is weighing a big electric appliance, our post on tankless water heater electrical requirements covers the panel question from another angle, and the dedicated circuit installation page is where to book.