Key takeaways
- A whole house electric tankless heater usually needs several large 240 volt circuits, listed on its nameplate.
- The real question is the service: a heater that size can use most of what a smaller service has to spare.
- A gas tankless heater needs only a small circuit for its controls and fan, but the gas and venting are their own jobs.
Tankless water heater electrical requirements surprise a lot of homeowners. A tank heater warms water slowly over hours. An electric tankless heater warms it in the seconds it takes to pass through, and that takes a great deal of power at once. Before buying one, check what it asks of your circuits and your panel, because that can decide the whole project.
How much power does an electric tankless water heater need?
More than most people expect. A point of use unit under one sink may need a single modest circuit. A whole house unit sized for showers in winter often needs two, three or four large 240 volt circuits, each with its own breaker. The nameplate and the installation manual list exactly how many circuits, what size, and what wire.
In San Antonio the incoming water is warmer than in northern states for much of the year, which helps. But a cold snap is exactly when the heater works hardest, and the electrical has to be sized for that day, not for August.
Will my panel and service handle it?
This is the question that matters. Each of those circuits takes two spaces in the panel, and the heater's total draw has to fit inside the service alongside the air conditioning, the range, the dryer and anything else that runs at the same time. The National Electrical Code sets out how that load calculation is done. A home on a smaller or older service may find a whole house electric tankless heater needs a service upgrade first.
We run that calculation before anything is ordered. Sometimes the answer is a larger service; sometimes it is a smaller unit, a gas unit, or staying with a tank. Our guide to panel capacity for an EV charger walks through the same kind of math for another big load.
What does a gas tankless water heater need electrically?
Much less. A gas tankless heater uses electricity only for its controls, its igniter and its vent fan, usually from a standard 120 volt outlet or a small circuit near the unit. The bigger jobs on a gas unit are the gas line, which often needs a larger size than a tank heater used, and the venting, which a plumber handles.
Why does my water heater keep tripping the breaker?
On a tankless unit, a tripping breaker can point to a failed heating element, a loose connection that is heating up, or a circuit that was undersized from the start. On a tank heater the usual causes are similar. Our post on a water heater that keeps tripping the breaker goes through them. Either way, it is worth a visit rather than resetting it again and again.
Does a tankless water heater need a permit in San Antonio?
The new circuits are permitted electrical work inside the city, pulled by the licensed electrical contractor on the City's electrical permit application. The plumbing side has its own permit, pulled by the plumber. If the service is upgraded at the same time, CPS Energy disconnects and reconnects it, and we schedule that with them.
What should I ask before I buy one?
- How many circuits, of what size, does this model need? It is in the installation manual.
- Does my service have room for that load on the coldest morning of the year?
- Is there space in the panel, or will it need a subpanel or an upgrade?
- Who is doing the plumbing, and who is doing the electrical?
- Is the price written before the work starts?
Send us the model you are considering and a photo of your panel label. We will tell you what the electrical side involves and write the price before the work starts. Book through the dedicated circuit installation page. If the kitchen is next, our post on induction range electrical requirements covers that load.