Key takeaways
- One GFCI outlet can protect several others, sometimes in another bathroom, the garage or outside.
- A GFCI that will not reset may have no power reaching it, may have failed, or may be reporting a real ground fault.
- The code requires GFCI protection for bathroom receptacles, and their circuit is a 20 amp circuit.
Bathroom outlets not working is one of the most common electrical calls, and most of the time the fix is one button. Bathroom outlets are protected by a GFCI, and that GFCI is not always in the same room. If the button will not reset, the next step is GFCI outlet repair or replacement.
Why are all my bathroom outlets dead at once?
A single GFCI outlet can protect every outlet wired after it on the same circuit. In many homes, one GFCI in one bathroom protects the outlets in a second bathroom too, and in some homes it is in the garage or on an outside wall. When it trips, every outlet after it goes dead, and none of them show why.
Where is the GFCI that controls my bathroom outlets?
- Look for an outlet with TEST and RESET buttons in each bathroom, including the other bathrooms.
- Check the garage, the outdoor outlets and the laundry area.
- Check the panel for a GFCI breaker, which has its own test button, and for any tripped breaker.
- Press RESET firmly. If the outlets come back, you found it.
Why won't the GFCI reset?
Many newer GFCIs will not reset unless power is reaching them, so a tripped breaker upstream keeps the button from latching. A GFCI that has power and still will not reset may have failed; they do wear out. Or it may be doing its job: if something on the circuit is leaking current to ground, the GFCI will trip again as soon as you reset it.
What trips a bathroom GFCI?
Water in an outlet or a cover, a hair dryer or curling iron with a worn cord, a damaged appliance, or moisture in an outdoor outlet on the same circuit can all trip it. So can a heavy load like a hair dryer and a heater on one circuit, which trips the breaker instead. Our post on a GFCI that keeps tripping walks through finding the cause.
What does the code require for bathroom outlets?
The National Electrical Code requires GFCI protection for receptacles in bathrooms, and it requires bathroom receptacles to be supplied by a 20 amp branch circuit. Texas enforces the 2026 NEC adopted by TDLR. Older homes may have been wired to earlier rules, which is one reason an outlet without GFCI protection is a common inspection item.
Is it safe to keep resetting a GFCI?
Resetting once after a trip is normal. A GFCI that trips again and again is telling you something is leaking current, and a bathroom is the last place to ignore that. Unplug everything on the circuit and try once more. If it still trips, leave it off and call.
What should I do next?
Note which outlets are dead and which GFCI you found, if any. Book a GFCI outlet visit and you get a written price before any work starts. If a storm just came through and more than the bathroom went dark, read power surge in house.