Warehouse electrician San Antonio

Warehouse lighting installation and power for San Antonio distribution buildings

High bay lighting that puts light on the rack faces and the dock, power where the racking, the conveyors and the lift truck chargers end up, and controls that dim empty aisles. Bid in writing, permitted, and scheduled around your shifts.

  • Licensed and Insured
  • BBB Accredited
  • Veteran Owned
  • TECL 41806

Tell us what is going on

Tap what you need, tell us when, and a real electrician calls you back.

Step 1 of 2

What do you need?
When works for you?

Sparks, burning smell, or a dead panel? Call (210) 446-5446 now instead of waiting on a callback.

We only use your number to call you back about this job.

By continuing, you agree that Wattsmith may call or text you back about your request.

You approve one flat price before any work starts. No hourly meter, no surprise invoice.

We hit your window. Miss it with no heads-up, and that is $149 off. The fine print

A Wattsmith electrician calls you back within 15 minutes during business hours.

What the work involves

How should warehouse lighting be laid out?

Warehouse lighting should be laid out to the final racking plan, not to an empty floor. Fixtures over the aisles light the rack faces where people pick, and occupancy sensors in each aisle let a fixture run low or off until someone walks in. Lift truck charging is planned early too, so a feeder is not sized twice.

Lay out the lighting to the racking

Warehouse lighting is laid out to the racking plan, not to an empty floor. Fixtures over the aisles light the rack faces where people pick, and fixtures over open floor and staging areas are spaced for that work. When the racking plan changes after the fixtures go up, the light ends up over the tops of the racks.

  • Fixture layout from the racking and floor plan
  • Aisle, staging and dock areas lit for the work done there
  • Mounting heights checked against sprinklers and clearances

Controls that dim empty aisles

The energy code calls for automatic controls in warehouses, and occupancy sensors in each aisle let a fixture run low or off until someone walks in. Daylight controls near skylights and dock doors reduce the light when the sun does the work. The controls are planned with the layout so each sensor sees the aisle it serves.

  • Aisle occupancy sensors
  • Daylight controls near skylights and doors
  • Zones that match how the building is used

Retrofitting an occupied warehouse

Replacing old metal halide or fluorescent high bays in a running warehouse means working from a lift above product and traffic. We plan the sequence aisle by aisle with you, so each section is closed only while we work over it, and the old fixtures and lamps are removed and disposed of with the job.

Dock doors, levelers and conveyors

Each dock door operator, leveler and restraint needs power at the door, usually with a disconnect, and the equipment supplier's sheets set the voltage and the circuit size. Conveyors and sortation lines need their feeds and motor controls in place before the equipment is set, so the power is ready on the day it lands.

  • Dock door, leveler and restraint circuits
  • Conveyor feeds and motor controls
  • Disconnects where the code requires them

Lift truck and fleet charging

Lift truck chargers often run together overnight, so the feeder and the panel are sized for all of them at once. Electric trucks for deliveries are a separate charging system with its own load study. Planning the charging area early keeps a feeder from being sized twice.

Code, permit and the utility

Inside the city limits the electrical permit goes through the City of San Antonio Development Services Department, under the 2023 National Electrical Code the city adopted effective May 1, 2025. Panels and disconnects need the working space NEC 110.26 requires, which pallets tend to take over. Where the service has to grow, the change is coordinated with CPS Energy.

What goes wrong, and how we prevent it

The usual problems are lights placed before the racking was final, chargers added to a panel that was already full, and working space in front of panels lost to storage. We work from the final racking plan, run the load calculation before chargers are added, and mark the clear space in front of every panel we install.

Questions about warehouse lighting installation and electrical work? Call or get a quote.

Commercial quote

What should we know about your warehouse before we bid?

Describe the building, the racking and the work. The owner responds the same business day.

Prefer to talk? Call (210) 446-5446.

Step 1 of 2

What do you need?
When works for you?

Sparks, burning smell, or a dead panel? Call (210) 446-5446 now instead of waiting on a callback.

We only use your number to call you back about this job.

By continuing, you agree that Wattsmith may call or text you back about your request.

You approve one flat price before any work starts. No hourly meter, no surprise invoice.

We hit your window. Miss it with no heads-up, and that is $149 off. The fine print

A Wattsmith electrician calls you back within 15 minutes during business hours.

FAQ

What do warehouse managers ask about their electrical work?

Straight answers. If you do not see yours, call us and ask.

Yes. We plan the work aisle by aisle with you, so each section is closed only while we work over it, and nights or weekends can be scheduled where the floor cannot stop.