Gate, keypad and access power
The gate operator, the keypads and the access control panel need their own circuits, and the runs out to the gate often cross the drive, so they go underground in conduit. A dead gate locks every tenant out, so these circuits get surge protection and a clear label at the panel.
- Dedicated circuits for the gate operator and keypads
- Underground conduit runs to the gate
- Surge protection on access equipment