Lifts and shop equipment
Vehicle lifts, tire machines, balancers and welders each come with a manufacturer's sheet that names the voltage, phase and circuit. Many run at 240 volts, and some need three-phase power. We wire each from its sheet, with the disconnects where the code requires them.