Key takeaways
- Match the receptacle to the RV's plug: a 30 amp RV uses a 120 volt TT-30 receptacle; a 50 amp RV uses a 120/240 volt 14-50.
- A dryer outlet, or a TT-30 wired at 240 volts, can damage an RV's 120 volt equipment. This is the most common and costly mistake.
- An outdoor RV outlet needs a dedicated circuit, room in the panel, GFCI protection and a weatherproof cover, and the work is permitted.
An RV hookup at home lets you run the air conditioner and charge the batteries before a trip, or keep a parked RV ready year round. The job is a dedicated circuit to the right receptacle in the right place, much like any 240 volt outlet installation. The details are what matter, because the wrong receptacle can damage the RV.
Do I need a 30 amp or 50 amp RV outlet?
Look at the RV's power cord. A 30 amp RV has a plug with three prongs, two flat and angled with a round ground, called a TT-30. It runs on 120 volts. A 50 amp RV has a large four prong plug, called a 14-50, and runs on 120/240 volts, giving it two separate 50 amp legs.
A 50 amp outlet can feed a 30 amp RV through an adapter, but not the other way around without limiting what the RV can run. If you have a 50 amp RV, or might buy one, the 50 amp outlet is the better long term choice.
Can I plug my RV into the dryer outlet?
No. A dryer outlet is a 30 amp receptacle wired for 240 volts, and many RV owners have learned the hard way what 240 volts does to an RV's 120 volt air conditioner, converter and electronics. The same thing happens when a TT-30 receptacle is mistakenly wired at 240 volts. It is one of the most expensive wiring mistakes there is, and we check the voltage at the receptacle before an RV is ever plugged in.
Will my panel have room for an RV outlet?
A 50 amp RV circuit takes two spaces and a meaningful share of a home's service, especially with the RV's air conditioner running in summer. A load calculation shows whether the service can carry it alongside the house. If it cannot, a panel upgrade or a smaller circuit for a 30 amp RV may be the answer.
Does an outdoor RV outlet need GFCI protection?
Yes. The National Electrical Code requires ground fault protection for outdoor receptacles at homes, and that includes the RV outlet. It also needs a weatherproof cover that keeps the receptacle dry while the RV is plugged in. Our guide on where GFCI outlets are required lists the other places.
Where should the RV outlet go?
Close to where the RV parks, so the RV's own cord reaches without an extension. Long runs from the panel need larger wire to keep the voltage up at the RV, which matters for the air conditioner. Most installs mount the receptacle on the side of the house or on a post at the pad. If the RV parks by a detached garage, a subpanel out there can feed it.
Does an RV outlet need a permit in San Antonio?
Yes. A new circuit is permitted work inside the city, pulled by the licensed electrical contractor on the City's electrical permit application, and the City's amendments to the code are in Chapter 10 of its city code. Texas adopted the 2026 NEC effective September 1, 2026, as TDLR announced.
Send us a photo of the RV's plug, the panel and where the RV parks, and we will write the price before the work starts. If an outdoor circuit already trips in wet weather, read our post on a breaker that trips when it rains first.