Key takeaways
- Houston requires every electrical contractor to register with the Electrical Inspections section, with its state master and contractor licenses and a notarized form CE-1189; registration is valid for one year.
- Since April 1, 2022, a master electrician of record may be on only one contracting business's city registration.
- TDLR requires a license for all electrical work in Texas; a contractor must employ a master electrician and carry business liability insurance.
- After storm damage, the city says only a registered City of Houston electrical contractor can repair your electrical service.
Electrical contractor registration in Houston sits on top of the state license. TDLR licenses electricians and electrical contractors for all of Texas, and the City of Houston then requires every contractor that works in the city to register with its Electrical Inspections section before it can buy a permit or schedule an inspection. For a building owner, the two together are the quickest way to tell whether an electrical contractor can legally do your work. This guide explains what the city and TDLR each require, and what to check before you hire, using their own pages.
What does Houston require of an electrical contractor?
Houston says any person or business that wishes to perform electrical work within the city must register, and that master electricians, electrical contractors and appliance installers all must register. The city's code adds that an applicant for contractor registration must hold a valid state license as an electrical contractor. Registration is valid for one year.
Section 403.1 of the City of Houston Electrical Code puts it directly: no person shall undertake any work as a contractor unless registered with the city as a contractor or holding a current city contractor license. The state license comes first, and the city registration follows it. Because registration runs one year at a time, the right question for a contractor is not whether it registered once but whether its registration is current today.
The requirements are on the Houston Permitting Center's Electrical Contractor Registration page, and the contractor rules are in the City of Houston Electrical Code.
What does a Houston registration application include?
The city asks for three documents: a copy of the master electrician's license granted by the State of Texas, a copy of the contractor license granted by the State of Texas, and a notarized copy of form CE-1189, the Electrical State License Registration and Renewal form. Registration is handled by the Electrical Inspections section.
- A copy of the master electrician's Texas license.
- A copy of the electrical contractor's Texas license.
- A notarized form CE-1189, Electrical State License Registration and Renewal.
The Electrical Inspections section lists the registration of licensed contractors and electrical masters among its duties, along with inspections and utility releases. That is the same office that will inspect your job, so a contractor's registration and its inspections run through one place.
Why can a master electrician register only one business?
Since April 1, 2022, under Section 404, the master electrician of record may not have a city electrical contractor's registration for more than one contracting business. Each registered contractor needs its own master of record, so one master's license cannot be lent across several companies working in Houston.
TDLR has a parallel rule at the state level. A master electrician may be assigned to only one electrical contractor, unless that master owns more than 50 percent of the business. Both rules aim at the same thing: the master named on the license is a real person responsible for the work that contractor does.
The city's rule is on the Electrical Inspections page, and the state rule is on TDLR's electrical contractor license page.
What does TDLR require of an electrical contractor?
TDLR says anyone who performs electrical work in Texas must be licensed. An electrical contractor is licensed to engage in the business of electrical work, must employ a licensed master electrician to apply, and must maintain the required limits of business liability insurance. The master may be the owner.
The master electrician behind the license is an experienced electrician. To apply for a master license, TDLR requires at least two years as a licensed journeyman electrician and 12,000 hours of on-the-job training, followed by approval to take the licensing exam. That master's license is what the contractor license, and the Houston registration, rest on.
The details are on TDLR's master electrician license page and TDLR's electricians FAQ.
Is a Texas electrical license valid in Houston?
Yes. TDLR says a state license is valid anywhere in Texas. A city may require its own license only from someone who does not hold a state license, may not make a state licensee take a municipal exam, and may still collect building permit fees. Houston still requires state licensees to register with the city.
That is how a contractor based outside Houston can work there. Our electrical contractor license is TECL 41806, a statewide license, and we register with the City of Houston before we buy a Houston permit. We work Houston from San Antonio on commercial, industrial and standby generator jobs.
How does registration affect permits and inspections?
Directly. Only a licensed and registered electrical contractor may obtain a Houston electrical permit, and the city issues electrical permits only to registered master electricians. To schedule inspections, the master and contractor registrations must both be in good standing. A lapsed registration stops a job at the permit or at the next inspection.
On commercial work, the Permitting Center's own guidance says the master electrician must be licensed by TDLR and registered with the City of Houston to buy the electrical trade permit. That permit is bought after the building permit, in iPermits, and every inspection after it is called under the same registration.
The permit side is covered in how commercial electrical permits work in Houston, and plan and inspection rules in the Houston electrical code guide.
What should a building owner check before hiring?
Check that the contractor holds a current TDLR electrical contractor license, that a licensed master electrician stands behind it, and that its City of Houston registration is current for this year. Ask for proof of business liability insurance, and confirm the contractor will buy the permit in its own name before work starts.
- The TDLR electrical contractor license number, looked up with TDLR.
- The master electrician of record, and that the master's license is active.
- A current City of Houston electrical contractor registration.
- A certificate of business liability insurance.
- Who buys the permit: it should be the electrical contractor, never the owner.
- A written scope and estimate before work begins.
TDLR's reminder after the May 2024 storms says the same in plain words: anyone performing or offering to perform electrical work in Texas must be licensed by TDLR and work through a TDLR-licensed electrical contractor, and owners should make sure any required permit is in place through the city or county before work begins.
TDLR's May 22, 2024 storm repair reminder is the source.
Who can repair electrical service after a Houston storm?
The City of Houston says, in its emergency fast track notice, that only a registered City of Houston Electrical Contractor can repair your electrical service. The fast track covers like-for-like repairs only, no improvement. Anything beyond putting back what was there goes through the normal permit process instead.
The registration check above is the same one to run after a storm, when the pressure to hire whoever is available is highest. Ask for the city registration before any work starts, and confirm the contractor will handle the permit. If a utility line is down, stay away from it and call CenterPoint or 911 first.
The city's notice is Emergency: fast track your electrical permit. For storm damage at a business, see our emergency commercial electrician Houston page, the Houston commercial electrician hub and our commercial electrical services.