Key takeaways
- Most failed electrical items are missing protection, missing covers, loose or unlabeled work, or grounding and bonding.
- A city inspection failure is corrected and re-inspected on the same permit; a home inspection item is fixed and documented for the buyer.
- Get the exact list in writing, and have one electrician price all of it at once.
A failed electrical inspection usually means a list, not a disaster. Whether it is a city inspector's correction notice on a permit or a buyer's home inspection report, the items that fail tend to repeat, and our electrical code correction work is mostly the same dozen fixes done properly.
Which kind of inspection failed?
It matters which one. A city inspection is part of a permit: the inspector checks the work against the adopted code, and the job is not finished until it passes. A home inspection for a sale is a report for the buyer: the inspector notes conditions, the buyer asks for repairs, and nothing is enforced by the city unless the repair itself needs a permit.
Inside San Antonio, the City adopts the National Electrical Code with local amendments in Chapter 10, and permit inspections are made against that. Texas moved to the 2026 edition on September 1, 2026, as TDLR announced.
What fails most often?
- Missing GFCI protection in kitchens, bathrooms, garages, laundry areas and outdoors.
- Missing AFCI protection on bedroom and living space circuits in new or altered work.
- Open junction boxes, missing cover plates and splices with no box at all.
- Double tapped breakers: two wires under a terminal made for one.
- Grounding and bonding: a missing bond to the water or gas pipe, or a ground rod issue.
- An unlabeled or mislabeled panel, or blocked working space in front of it.
- Smoke alarms missing or not interconnected where the work triggered the requirement.
- Wrong breaker sizes for the wire, or a breaker not listed for the panel.
How do corrections get made and re-inspected?
For a city inspection, the contractor who holds the permit makes the corrections and calls for a re-inspection on the same permit. Leave the correction notice where we can see it. It names the code section and the location, which saves time.
For a home inspection, the corrections are made to the report's items, and the buyer usually wants an invoice or a letter saying what was done. If a correction is itself permitted work, such as a panel replacement, it gets its own permit and inspection.
How do I keep a sale or remodel on schedule?
- Get the full list in writing before anyone starts, not a summary over the phone.
- Have one electrician price every item at once, so nothing falls between two people.
- Ask which items need a permit, because those take longer.
- Ask for a written record of what was corrected, for the file and for the buyer.
Is a failed item always a safety problem?
Not always. Some items are a code change since the house was built, such as GFCI in a place that did not need it in 1985. Others, like a double tapped breaker or an open splice, are real hazards. Part of the job is telling you which is which, so you can decide what matters for safety and what matters for the sale.
Missing GFCI protection is the item that turns up most. Our guide on where GFCI outlets are required lists the places. Older panels are next, and fuse box replacement explains that job.
Who can make the corrections?
Electrical corrections are electrical work, and in Texas that is done by licensed electricians working for a licensed contractor. You can check a license on TDLR's electrician pages. Send us the list on the electrical code correction page and you get a written price for the items.