Key takeaways
- FHA electrical requirements and VA loan electrical requirements come from each program's minimum property standards, which expect a safe, working electrical system.
- The appraiser notes conditions, and the lender decides what must be repaired before the loan closes; confirm the specifics with your lender.
- Exposed wiring, missing covers, non-working systems and visible hazards are the electrical items that most often appear as required repairs.
- A licensed electrician's written report and a flat repair price give the buyer, seller and lender a clear path to clear the condition.
- Getting the repair done and documented early protects the closing date, because a reinspection takes time to schedule.
You are buying with an FHA or VA loan, the appraisal came back with conditions, and one of them is electrical. Or you are about to make an offer and want to know what can stop the deal. FHA electrical requirements and VA loan electrical requirements are less mysterious than they sound: both programs expect the home to be safe and livable, and both treat a working electrical system without obvious hazards as part of that. The details, and what has to be fixed before closing, are decided by the appraiser and your lender.
This guide explains what the appraisal looks at, the electrical items that most often hold up a government-backed loan, and how a licensed electrician's report and repair price help you close on time. It is a plain-language guide, not a rulebook. Always confirm the specific requirements for your loan with your lender.
If an appraisal condition is already in your hands, call us and read it to us. We will tell you on the phone what the repair usually involves and how fast we can schedule it.
What FHA and VA appraisals look at
FHA loans are insured by the Federal Housing Administration, part of HUD, and VA loans are backed by the Department of Veterans Affairs. Both programs set minimum property standards for the homes they will back. The idea is the same in both: the house should be safe, sound and sanitary, and the systems it needs to be livable should work.
The appraisal is where those standards are applied. The appraiser's main job is to value the property, and while doing it, the appraiser notes conditions that do not meet the program's standards. For the electrical system, that generally means looking for a system that works and does not present an obvious hazard to the people living there.
An appraisal is not a home inspection, and it is not an electrical inspection. The appraiser is not opening the panel or testing circuits. The appraiser notes what is visible and obvious. Both programs encourage buyers to get their own inspections for exactly that reason.
Who decides what must be repaired
The appraiser notes the condition. The lender reviews the appraisal and decides what has to be repaired, and how it has to be documented, before the loan can close. Different lenders can handle the same condition differently, and some have requirements of their own on top of the program's.
That is why the first step with any electrical condition is to ask your lender three questions: exactly what needs to be repaired, who is allowed to do the repair, and what proof they need. Some lenders want a paid invoice. Some want a written statement from a licensed electrician. Some require the appraiser to come back and confirm the repair. Knowing which before the work starts saves a second round.
FHA electrical requirements in plain terms
For an FHA loan, the practical test for the electrical system is that it is safe and working. Power should reach the house and the living areas, the panel should be in usable condition, and there should be no exposed live wiring or other visible hazard. The appraiser is not grading the system against the latest electrical code. A house built decades ago is not expected to look like a new build. What gets flagged is something that is plainly unsafe or plainly not working.
If you want a specific answer about a specific condition, ask your lender. We are electricians, not underwriters, and we will not guess at a rule. What we can do is tell you what the condition is, how serious it is and what the repair costs.
VA loan electrical requirements in plain terms
VA loan electrical requirements follow the same logic. The VA's minimum property requirements expect a home that is safe and sound, with systems that work. The VA appraiser notes electrical conditions that do not meet that, and the lender decides what has to be done before closing.
Wattsmith Electric is a veteran-owned company. If you are using your VA benefit, you already know the paperwork can be the slow part. The electrical piece does not have to be.
Common electrical items that hold up a government-backed loan
These are the conditions that most often appear on an FHA or VA appraisal as electrical repairs. Your lender makes the final call on any of them.
- Exposed wiring: open splices, bare conductors, cable hanging loose in a garage or living area, or wires sticking out of a wall where a fixture was removed.
- Missing covers: outlets and switches with no cover plate, junction boxes without lids, or a panel with missing knockouts or a missing dead front.
- Non-working systems: no power to part of the house, dead circuits, or a service that has been disconnected.
- Visible hazards: scorched outlets, a panel with burn marks, extension cords used as permanent wiring, or a damaged service mast.
- Missing or damaged electrical equipment where the house needs it to be livable, such as a broken disconnect for the air conditioner.
Most of these repairs are small. A missing cover plate is a few minutes of work. Exposed splices need a junction box and a cover. A panel with open spaces or double taps needs correction. The cost is rarely the problem; the timing is.
For outlets and covers, our outlets and GFCI service handles the repair. For panel issues, see our guide to home inspection electrical items in San Antonio.
Panel conditions: double taps and other violations
Panel findings deserve their own mention because they show up often in older San Antonio homes, and because the appraiser may note a panel problem that the home inspector already flagged in more detail. Double taps, missing filler plates over open spaces, a missing dead front and breakers that do not match the panel are the common ones.
When the panel itself is sound and the problem is how it has been wired or covered, the correction is a defined job in our price book. It is listed as the Double-tap and panel violation correction task, from $499. You approve the flat price before we open the panel, and the electrician documents the correction for your lender. Starting price. Your tech confirms the final number on site before any work.
If the panel is a Federal Pacific or Zinsco, or the bus is damaged, correction may not be the right repair. Our guide to Federal Pacific and Zinsco panels explains why, and our panel upgrade service covers replacement.
How a licensed electrician's report helps you close on time
An appraisal condition that says "repair exposed wiring in garage" tells you what the problem is. It does not tell you how many other problems are sitting behind the same panel, how long the repair takes or what it costs. A full electrical inspection by a licensed electrician answers those questions before the appraisal ever happens, or right after it.
- Early: get the electrical inspection during your option period, before the appraisal. Anything that might trip an FHA or VA condition shows up in the report, and you can ask the seller to repair it before the appraiser arrives.
- After the appraisal: send the condition to the electrician, get the repair priced and scheduled, and get written documentation in the form your lender asks for.
- In negotiation: a written report and a flat repair price give the seller a clear, limited request, which makes it easier for them to agree.
When the lender requires a repair before closing, the seller usually has to agree to it, because the work happens at the seller's house before the loan funds. A seller who sees a short list with a price is more likely to say yes quickly than one who sees a vague condition and imagines the worst.
For how buyers and sellers handle repairs after an inspection, see electrical repairs after a home inspection in Texas. If you are the seller, our guide to a pre-listing electrical inspection helps you fix these items before an FHA or VA buyer ever makes an offer.
A timeline that protects your closing date
Electrical conditions rarely kill an FHA or VA deal. Late electrical conditions delay them. The repair itself is often short; the time goes into finding an electrician, getting the seller to agree, scheduling the work, getting the documentation to the lender and, where the lender requires it, scheduling the appraiser to come back. Each step waits on the one before it.
- During the option period: home inspection first, then the electrical inspection, with any Safety and Repair findings included in your repair request.
- Before the appraisal: the seller completes the agreed repairs, so the appraiser sees a finished house.
- If the appraisal still notes a condition: send it to the electrician the day you receive it and ask your lender exactly what proof they need.
- After the repair: forward the signed documentation to your lender and confirm whether a reinspection is required.
If your appraisal date is already set, book the electrical inspection now so the findings are in your hands before the appraiser arrives.
Our electrical inspection service page explains the visit, and our pricing page shows the flat prices for the repairs that most often appear on FHA and VA appraisals.
The real estate electrical inspection
Wattsmith Electric is licensed by TDLR (TECL 41806). Our real estate electrical inspection covers the full system and produces a written report: findings by area, each with a recommendation and a rating of Safety, Repair or Maintenance, labeled photos beside each finding, and a priority action plan. A Texas licensed master electrician signs it in our app, with a certificate of completion that shows the document has not been altered. You receive it by text and email, ready to forward to your agent, the seller's agent and your lender.
For FHA and VA buyers who want to find problems before the appraiser does, our published price book lists the Real estate electrical inspection task, from $399. It is one flat price, including the signed report, approved before the visit. Starting price. Your tech confirms the final number on site before any work.
When repairs follow, we price them from the same book, and where a permit is required we pull it through the San Antonio Development Services Department and meet the city inspector. Ask your lender what documentation they need and tell us when you book, so the paperwork matches what the underwriter expects.
Book the inspection or the repair, see the published prices on our pricing page, or read more on our electrical inspection service page.
If you are the agent on an FHA or VA deal, send this page to your buyer before the appraisal, and see our page for real estate agents. We schedule around the closing date.