Skip to content
Wattsmith Electric

San Antonio Built. On Time. Done Right.

San Antonio electrician, on time and priced straight

We find the fault others miss, quote one flat price before we start, and do the work to code the first time. Licensed and insured. Same-day service available.

  • Licensed and Insured
  • BBB Accredited
  • Veteran Owned
  • TECL 41806

5.0 on Google, 11 reviewsas of October 2, 2026

GeneracWe sell and install Generac home standby and commercial generators.
Request serviceStep 1 of 4

The problem

Problem type

A Wattsmith electrician calls you back within 15 minutes during business hours.

Electrical emergency? Sparks, burning smell, or a dead panel: call (210) 446-5446 now

Emergency service

Straight-dealing electricians

Veteran-owned, and it shows in the work

Most electrical outfits run an hourly meter you cannot see and hope the job stretches. Wattsmith works the other way. We diagnose the real problem, set one flat price before we start, and you decide with the whole number in front of you.

We founded the company on the discipline the military teaches. Show up on time. Build to standard, not to shortcut. Leave the space better than you found it. That runs through every job we take in San Antonio.

Read our storyWhat customers say

Our guarantees

  • Our work, guaranteed

    If our workmanship fails within two years, we come back and put it right at no charge. That is our labor, on our word. Parts carry whatever the manufacturer gives them, and we tell you which is which before you approve anything.

  • Done to code

    Everything meets code and we stand behind it, or we come back and fix it.

  • The On-Time Promise

    We hit your window. Miss it with no heads-up, and that is $149 off.

  • $49 Off Your First Service Call

    New customers take $49 off their first diagnostic or service call with Wattsmith Electric. New residential customers only. One per household. Valid on your first service call only. Not combinable with other offers. No cash value. Mention this offer when you book.

  • Send us a neighbor

    Send somebody our way and you both come out ahead: $50 off their first job, and $50 back to you once it is done and paid. No cap and no expiry. Your $50 comes off your next invoice, or back to you if you have no work coming. It is for homeowners and customers, not real estate licensees, and it applies to repair and installation work, not to inspections for a home sale.

The fine print, in full

GeneracAligned Contractor

Generac generator installation in San Antonio

When CPS Energy drops, a Generac starts on its own and moves your house over in seconds. We size it, install it, run the gas line through a licensed plumber and keep it serviced.

Installed from $12,500 for a 14 kW to $16,500 for a 26 kW, gas line and permits included.

Rated output on natural gas

Generac's published ratings. Propane ratings are higher on most sizes.

Electrical Inspections

Real estate electrical inspection, $563

Labeled photos, a priority action plan, and a report signed by a Texas licensed master electrician.

For home buyers, sellers and real estate agents.

Starting price. Your tech confirms the final number on site before any work.

How it works

Four steps, from your call to the warranty

  1. 01

    You call

    A real electrician picks up, not a call center. We ask what the panel, the outlet, or the lights are doing, tell you if it sounds urgent, and set a real arrival window instead of a vague all-day block.

  2. 02

    We diagnose

    We show up in the window, find the actual fault instead of guessing, and walk you to the panel or the outlet so you see what we see. Estimates are free. If we have to troubleshoot a fault, that is charged as its own line.

  3. 03

    You get one price

    Before we touch a wire, you get one flat number for the whole job and you approve it. If we open something up and find more, we stop and price it first. The bill matches the number you approved.

  4. 04

    We finish and stand behind it

    We do the work to code, label the circuits, protect your floors, and haul our mess. Then we walk you through what changed, hand you the paperwork, and back it. If it is not right, we come back.

Service Area

San Antonio and the metro

We run out of San Antonio and cover the surrounding communities across Bexar, Comal, Guadalupe, Kendall, Wilson, Medina, and Atascosa counties. Tap a marker to find your community, or browse the full list.

BexarComalGuadalupeKendallWilsonMedinaAtascosaAlamo HeightsStone OakHelotesSchertzConverseUniversal CityLeon ValleyBoerneNew BraunfelsCiboloLive OakSelmaTimberwood ParkHollywood ParkCastle HillsWindcrestKirbyAlamo RanchWestover HillsMedical CenterBulverdeFair Oaks RanchTerrell HillsOlmos ParkShavano ParkGarden RidgeSpring BranchCanyon LakeSeguinMarionSaint HedwigAdkinsLa VerniaElmendorfChina GroveVon OrmySomersetLytleCastrovilleFloresvilleSan AntonioSan Antonio

Bexar County

San Antonio

San Antonio Metro

Your San Antonio electrician

A real electrician answers, not a call center

We run out of San Antonio and cover the metro across Bexar, Comal, Guadalupe, Kendall, Wilson, Medina, and Atascosa counties. Call for a flat-rate quote and you reach someone who does the work.

Wattsmith Electric

Address
11846 Wurzbach Rd, San Antonio, TX 78230
Serving San Antonio and the surrounding metro
Hours
Every day, 8am to 8pm. Emergency service available.
Licensing
Licensed and insured Texas electrical contractor. TECL 41806.

FAQ

San Antonio electrical questions, answered straight

Straight answers. If you do not see yours, call us and ask.

How much does an electrician cost in San Antonio?

In San Antonio, most electricians charge either a flat rate per job or an hourly rate that commonly falls in the range of roughly 100 to 200 dollars per hour, plus a diagnostic or trip fee. Wattsmith Electric quotes a flat rate for the whole job up front, so you approve the price before any work starts and there is no hourly meter running.

How much does a panel upgrade cost in San Antonio?

A residential electrical panel upgrade in San Antonio, such as moving from 100 amp to 200 amp service, typically ranges from about 1,500 to 4,000 dollars depending on the panel and meter location, whether the meter can and mast also need replacing, the condition of the grounding, and permit and utility coordination. Wattsmith quotes the exact number flat before the work begins.

Why do my breakers keep tripping?

A breaker in your San Antonio home keeps tripping because it is doing its job and interrupting a problem, usually an overloaded circuit with too many devices drawing power at once, a short circuit, or a ground fault. The fix is to find which of those is happening and correct the cause, not just reset the breaker, which is exactly what Wattsmith Electric diagnoses on a service call.

Do I need a permit to install an EV charger in Texas?

In most Texas cities, including San Antonio, installing a hardwired Level 2 EV charger requires an electrical permit and an inspection because it adds a dedicated 240 volt circuit to your panel. Rules are set by the local authority and can change, so we confirm the current requirement for your address. Wattsmith Electric pulls the permit, sizes the circuit correctly, and handles the inspection as part of the job.

How does flat-rate pricing work?

We diagnose the problem, show you what we found, and quote one flat price for the fix. You approve that number before we start. No hourly meter, no surprise line items when we finish.

Are you licensed and insured?

Yes. Wattsmith Electric is a licensed and insured Texas electrical contractor, and BBB accredited. Our technicians are background-checked, and every job is permitted and inspected where code requires it.

Do you offer same-day service?

Often, yes. Same-day service is available during business hours based on the schedule. Call us and we will tell you the soonest window straight, with no runaround.

What does veteran-owned mean for me?

It means discipline you can feel. We show up on time, we do what we say, we keep the job site clean, and we stand behind the work. Squared away, every visit.

Do you do both residential and commercial work?

Yes. We handle homes across the San Antonio metro and commercial spaces from retail build-outs to tenant improvements. Same flat-rate honesty on both sides.

What areas do you serve?

San Antonio and the surrounding metro, including Alamo Heights, Stone Oak, Helotes, Schertz, Boerne, New Braunfels, and more across Bexar, Comal, Guadalupe, Kendall, Wilson, Medina, and Atascosa counties.

Ready for an electrician who does it right?

Flat-rate pricing quoted up front. Licensed and insured. A Wattsmith electrician calls you back within 15 minutes during business hours.

  • Licensed and Insured
  • BBB Accredited
  • Flat-Rate Pricing
  • Background-Checked
Call NowGet a Quote